PN A51387A
B
1-19
Analyzer Overview
Preparing the Analyzer for Sample Runs
1
NOTE
For aperture tubes up to 100 µm, you can use an Accuvette® ST (20 mL). Use an ST Beaker for any
aperture tube size larger than 100 µm.
4.
Add a few drops of the calibrator, control sample, or sample to the electrolyte solution.
•
For more information on calibration, see
, page
•
For more information on control sample runs, see
Running a Concentration Control Sample
page
.
•
For more information on running a sample analysis, see
, page
5.
If necessary, use the platform release and lower the platform to the loading position.
6.
If necessary, turn the platform so that the correct side (ST Beaker or Accuvette® ST) is on top
(see
, page
).
NOTE
The sample platform has two usable sides. The ST Beaker side has a built-in guide to ensure that
a Multisizer 4 Smart Technology Beaker of any size is in the correct position when you raise the
platform. The Accuvette® ST side has a smaller guide for Accuvette STs. The guides ensure that
the ST Beaker or Accuvette® ST will be in the correct position relative to the aperture tube,
electrode, and stirrer when you raise the platform.
7.
Place the ST Beaker or Accuvette® ST on the sample platform.
8.
Raise the platform.
NOTE
It is not necessary to use the platform release to lift the platform into position.
Summary of Contents for Multisizer 4
Page 12: ...xii List of Figures ...
Page 14: ...xiv List of Tables ...
Page 22: ...PN A51387AB xxii Introduction Before You Start Warnings and Cautions ...
Page 42: ...PN A51387AB 1 20 Analyzer Overview Preparing the Analyzer for Sample Runs ...
Page 160: ...PN A51387AB 6 16 Analyzing a Sample Using Blank Runs ...
Page 232: ...PN A51387AB 10 8 Regulatory Compliance Additional Security Features ...