PN A51387A
B
6-1
CHAPTER 6
Analyzing a Sample
Analyzing a Sample
Analyzer Checklist
Beckman Coulter recommends that you follow this checklist before each sample run, even if no
change in Analyzer settings is required. For information on preparing for a sample run, see
Preparing the Analyzer for Sample Runs
, page
.
Before starting a sample run:
1.
Power on the Analyzer, open the Multisizer 4 software, and connect to the Analyzer (see
Opening the Multisizer 4 Software
2.
Fill the system with electrolyte solution.
3.
Secure the correct aperture tube in place (see
4.
Empty the Waste Tank, if necessary.
5.
Place a Multisizer 4 Smart Technology Beaker or Accuvette® ST with clean electrolyte and
sample on the platform.
6.
Raise the platform and make sure that the aperture is immersed in the electrolyte.
7.
Close the Sample Compartment door.
Selecting Analysis Settings
Before running an analysis, you can select settings for analyzing a sample and viewing analysis files
using the SOM Wizard (page
) and the Create Preferences Wizard (page
If you saved default or custom SOM files and Preferences, you can create one or more Standard
Operating Procedures (page
). Standard Operating Procedures (SOPs) are helpful if you are
running several types of analyses that require different settings.
A Standard Operating Procedure combines one Preferences file and one Standard Operating Method
(SOM) into an overall settings file for a particular type of analysis. Within the SOP, the SOM file
Summary of Contents for Multisizer 4
Page 12: ...xii List of Figures ...
Page 14: ...xiv List of Tables ...
Page 22: ...PN A51387AB xxii Introduction Before You Start Warnings and Cautions ...
Page 42: ...PN A51387AB 1 20 Analyzer Overview Preparing the Analyzer for Sample Runs ...
Page 160: ...PN A51387AB 6 16 Analyzing a Sample Using Blank Runs ...
Page 232: ...PN A51387AB 10 8 Regulatory Compliance Additional Security Features ...