PN A51387A
B
3-26
Installing and Calibrating an Aperture Tube
The Change Aperture Tube Wizard
Step 2: Remove the Currently Installed Aperture Tube
The Change Aperture Tube Wizard prompts you to remove the currently installed aperture tube
from the Sample Compartment, if necessary.
For information on removing an aperture tube, see
, page
In the Change Aperture Tube Wizard, click
(
Next
)
to proceed to the next step, Install the new
aperture tube (page
).
Step 3: Install the New Aperture Tube
After you remove the previously installed aperture tube from the Sample Compartment, the Change
Aperture Tube Wizard prompts you to install the new aperture tube.
For instructions, see
.
In the Change Aperture Tube Wizard, click
(
Next
)
to proceed to the next step, Place a beaker of
clean electrolyte on the platform.
Summary of Contents for Multisizer 4
Page 12: ...xii List of Figures ...
Page 14: ...xiv List of Tables ...
Page 22: ...PN A51387AB xxii Introduction Before You Start Warnings and Cautions ...
Page 42: ...PN A51387AB 1 20 Analyzer Overview Preparing the Analyzer for Sample Runs ...
Page 160: ...PN A51387AB 6 16 Analyzing a Sample Using Blank Runs ...
Page 232: ...PN A51387AB 10 8 Regulatory Compliance Additional Security Features ...