20-12
Art: 714382-00D
Rev. Date: 02/20/06
Operator Sample
Handling/Cartridge
Verification
When Verified
Verify the cartridge inserted has not been previously used
Every cartridge use
Verify the calibrant pack has not prematurely ruptured
Every cartridge use
Verify the electronic contact pads are dry and uncontaminated
Every cartridge use
Verify the proper amount of sample was placed into the sample
chamber
Every cartridge use
Verify the sample was properly positioned within the sample
chamber
Every cartridge use
Verify the sample is free of included bubbles
Every cartridge use
Verify the sample is not clotted
Every cartridge use
Verify the sample chamber is properly sealed with the snap closure
Every cartridge use
Validating the
Performance of the
i-STAT System
Until recently, regulations and laboratory accreditation standards specified the
use of traditional quality control regimens, including the daily use of liquid
“control” materials.
As new technologies such as the i-STAT System have become available, the
community has recognized the limitations of relying upon traditional regimens,
prompting various regulatory and accreditation organizations to modify their
standards accordingly.
Many of the newly drafted regulations and accreditation standards recognize
the danger of denoting specific methods of achieving an effective quality
control regimen. Additionally, specific methods cannot anticipate future
technological changes, so many of the regulatory and accreditation
organizations are changing their standards to place the responsibility of
establishing and validating the quality system a laboratory employs on the
laboratory director.
Quality control regimens should be established using information from the
manufacturer and scientific literature.
It is important to validate the performance of the i-STAT System and the
recommended quality control regimen to develop personal confidence in
our approach to the challenges of putting a diagnostic device in the hands of
individuals untrained in laboratory science.
Some of the regulatory and accreditation organizations recommend the daily
use of liquid “control” materials for the first month of use, slowly stepping back
the frequency as a database of performance information increases confidence
levels. The number of lots of materials examined should also be considered
when determining a validation protocol.
Summary of Contents for i-STAT 1
Page 1: ...i STAT 1 System Manual Rev Date 20 Jan 12 Art 714336 00L ...
Page 18: ...1 8 Art 714363 00U Rev Date 02 Aug 12 ...
Page 44: ......
Page 90: ......
Page 106: ...9 12 Art 714371 00E Rev Date 06 Aug 12 ...
Page 162: ......
Page 166: ...Art 730292 00A Rev Date 20 Feb 12 4 ...
Page 176: ...10 10 Art 714372 00L Rev Date 30 Jul 12 ...
Page 182: ...11 6 Art 714373 00F Rev Date 17 Jan 11 ...
Page 184: ...12 2 Art 714374 00J Rev Date 25 Aug 11 ...
Page 185: ...Art 714374 00J Rev Date 25 Aug 11 12 3 ...
Page 186: ...12 4 Art 714374 00J Rev Date 25 Aug 11 ...
Page 187: ...Art 714374 00J Rev Date 25 Aug 11 12 5 ...
Page 192: ......
Page 194: ......
Page 214: ...14 20 Art 714376 00M Rev Date 31 Jan 12 ...
Page 216: ...14 22 Art 714376 00M Rev Date 31 Jan 12 ...
Page 218: ...14 24 Art 714376 00M Rev Date 31 Jan 12 ...
Page 220: ...14 26 Art 714376 00M Rev Date 31 Jan 12 ...
Page 222: ...14 28 Art 714376 00M Rev Date 31 Jan 12 ...
Page 224: ...14 30 Art 714376 00M Rev Date 31 Jan 12 ...
Page 226: ......
Page 236: ......
Page 252: ...17 4 Art 714379 00F Rev Date 18 Jul 12 ...
Page 254: ......
Page 294: ...Art 725768 00E Rev Date 04 Jan 12 20 ...
Page 336: ...22 2 Art 714384 00D Rev Date 07 18 06 ...
Page 342: ...22 8 Art 714384 00D Rev Date 07 18 06 ...
Page 348: ...22 14 Art 714384 00D Rev Date 07 18 06 ...
Page 352: ...22 18 Art 714384 00D Rev Date 07 18 06 ...
Page 364: ...22 30 Art 714384 00D Rev Date 07 18 06 ...
Page 384: ...22 50 Art 714384 00D Rev Date 07 18 06 ...
Page 404: ...22 70 Art 714384 00D Rev Date 07 18 06 ...
Page 488: ...Kaolin ACT 4 Art 715878 00M Rev Date 31 Jan 12 ...
Page 536: ......
Page 556: ...Art 714261 00E Rev Date 10 Jan 11 8 ...
Page 560: ...Art 716240 00D Rev Date 03 Mar 10 4 ...
Page 572: ...Art 715617 00D Rev Date 06 11 08 ...
Page 578: ...Art 714547 00F Rev Date 06 11 08 ...
Page 590: ...Art 720735 00B Rev Date 06 11 08 ...
Page 592: ...Art 721106 00B Rev Date 06 11 08 ...
Page 598: ...Art 722831 00A Rev Date 19 Feb 09 ...
Page 610: ...Art 720654 00B Rev Date 06 11 08 ...
Page 614: ...Art 721317 00D Rev Date 13 Aug 12 4 ...
Page 616: ...Art 725703 00A Rev Date 08 Mar 10 2 ...
Page 618: ...Art 721296 00A Rev Date 07 16 08 ...
Page 620: ...REV DATE 16 Oct 12 ART 714446 00L ...
Page 627: ...PROCEDURE MANUAL FOR THE i STAT SYSTEM 6 REV DATE 16 Oct 12 ART 714446 00L ...
Page 628: ...PROCEDURE MANUAL FOR THE i STAT SYSTEM 7 REV DATE 16 Oct 12 ART 714446 00L ...
Page 629: ...PROCEDURE MANUAL FOR THE i STAT SYSTEM 8 REV DATE 16 Oct 12 ART 714446 00L ...
Page 630: ...PROCEDURE MANUAL FOR THE i STAT SYSTEM 9 REV DATE 16 Oct 12 ART 714446 00L ...
Page 658: ......