Rev. Date: 23-May-12
Art: 716969-00J
BNP - 9
Method comparison data were collected using CLSI guideline EP9-A2.
26
Venous blood samples were
collected in EDTA evacuated tubes and analyzed in duplicate on the i-STAT System. A portion of the
specimen was centrifuged and the separated plasma was analyzed in duplicate on the i-STAT System and
on the comparative method within 1 hour of collection. Deming regression analysis
27
was performed on the
first replicate of each sample. In the method comparison table, n is the number of specimens in the first
data set, Sxx and Syy refer to estimates of imprecision based on the duplicates of the comparative and the
i-STAT methods respectively. Sy.x is the standard error of the estimate, and r is the correlation coefficient.*
Method comparisons may vary from site to site due to differences in sample handling, comparative method
calibration and other site specific variables.
The i-STAT BNP assay is designed for quantitation of BNP in whole blood or plasma samples. A series
of samples for comparison of whole blood and plasma results was prepared from blood drawn from
twenty-five nominally healthy donors. For each donor, whole blood (unspiked) and plasma obtained via
centrifugation were first run simultaneously in duplicate i-STAT BNP test cartridges. A whole blood sample
was then spiked with BNP and, following a short equilibration period, a plasma sample was prepared by
centrifugation and the whole blood and plasma samples were run simultaneously in duplicate. Three lots
of i-STAT BNP test cartridges were employed with a single lot being used for each donor. The results of
Deming regression of whole blood vs plasma (x-axis) correlation data are summarized below for all samples
( [BNP] < 5000 pg/mL) and separately for samples with [BNP] < 1000 pg/mL.
*The usual warning relating to the use of regression analysis is summarized here as a reminder. For any analyte, “if the data is a narrow range, the
estimate of the regression parameters are relatively imprecise and may be biased. Therefore, predictions made from estimates may be invalid”.
26
The
correlation coefficient, r, can be used as a guide to assess the adequacy of the comparative method range in overcoming the problem. As a guide, the
range of data can be considered adequate if r>0.975.
Precision Data (pg/mL)
Aqueous Control
Mean
%CV (within-run)
%CV (total)
Level 1
126
9.0
11.1
Level 2
1551
6.6
8.1
Level 3
3337
8.0
9.8
Method Comparison
Abbott ARCHITECT
N
433
Mean (pg/mL)
482.1
Sxx (pg/mL)
38.1
Syy (pg/mL)
97.6
Slope
0.971
Intercept
-14.4
Sy.x
198.0
Xmin
5
Xmax
4797.7
Correlation, r
0.972
Summary of Contents for i-STAT 1
Page 1: ...i STAT 1 System Manual Rev Date 20 Jan 12 Art 714336 00L ...
Page 18: ...1 8 Art 714363 00U Rev Date 02 Aug 12 ...
Page 44: ......
Page 90: ......
Page 106: ...9 12 Art 714371 00E Rev Date 06 Aug 12 ...
Page 162: ......
Page 166: ...Art 730292 00A Rev Date 20 Feb 12 4 ...
Page 176: ...10 10 Art 714372 00L Rev Date 30 Jul 12 ...
Page 182: ...11 6 Art 714373 00F Rev Date 17 Jan 11 ...
Page 184: ...12 2 Art 714374 00J Rev Date 25 Aug 11 ...
Page 185: ...Art 714374 00J Rev Date 25 Aug 11 12 3 ...
Page 186: ...12 4 Art 714374 00J Rev Date 25 Aug 11 ...
Page 187: ...Art 714374 00J Rev Date 25 Aug 11 12 5 ...
Page 192: ......
Page 194: ......
Page 214: ...14 20 Art 714376 00M Rev Date 31 Jan 12 ...
Page 216: ...14 22 Art 714376 00M Rev Date 31 Jan 12 ...
Page 218: ...14 24 Art 714376 00M Rev Date 31 Jan 12 ...
Page 220: ...14 26 Art 714376 00M Rev Date 31 Jan 12 ...
Page 222: ...14 28 Art 714376 00M Rev Date 31 Jan 12 ...
Page 224: ...14 30 Art 714376 00M Rev Date 31 Jan 12 ...
Page 226: ......
Page 236: ......
Page 252: ...17 4 Art 714379 00F Rev Date 18 Jul 12 ...
Page 254: ......
Page 294: ...Art 725768 00E Rev Date 04 Jan 12 20 ...
Page 336: ...22 2 Art 714384 00D Rev Date 07 18 06 ...
Page 342: ...22 8 Art 714384 00D Rev Date 07 18 06 ...
Page 348: ...22 14 Art 714384 00D Rev Date 07 18 06 ...
Page 352: ...22 18 Art 714384 00D Rev Date 07 18 06 ...
Page 364: ...22 30 Art 714384 00D Rev Date 07 18 06 ...
Page 384: ...22 50 Art 714384 00D Rev Date 07 18 06 ...
Page 404: ...22 70 Art 714384 00D Rev Date 07 18 06 ...
Page 488: ...Kaolin ACT 4 Art 715878 00M Rev Date 31 Jan 12 ...
Page 536: ......
Page 556: ...Art 714261 00E Rev Date 10 Jan 11 8 ...
Page 560: ...Art 716240 00D Rev Date 03 Mar 10 4 ...
Page 572: ...Art 715617 00D Rev Date 06 11 08 ...
Page 578: ...Art 714547 00F Rev Date 06 11 08 ...
Page 590: ...Art 720735 00B Rev Date 06 11 08 ...
Page 592: ...Art 721106 00B Rev Date 06 11 08 ...
Page 598: ...Art 722831 00A Rev Date 19 Feb 09 ...
Page 610: ...Art 720654 00B Rev Date 06 11 08 ...
Page 614: ...Art 721317 00D Rev Date 13 Aug 12 4 ...
Page 616: ...Art 725703 00A Rev Date 08 Mar 10 2 ...
Page 618: ...Art 721296 00A Rev Date 07 16 08 ...
Page 620: ...REV DATE 16 Oct 12 ART 714446 00L ...
Page 627: ...PROCEDURE MANUAL FOR THE i STAT SYSTEM 6 REV DATE 16 Oct 12 ART 714446 00L ...
Page 628: ...PROCEDURE MANUAL FOR THE i STAT SYSTEM 7 REV DATE 16 Oct 12 ART 714446 00L ...
Page 629: ...PROCEDURE MANUAL FOR THE i STAT SYSTEM 8 REV DATE 16 Oct 12 ART 714446 00L ...
Page 630: ...PROCEDURE MANUAL FOR THE i STAT SYSTEM 9 REV DATE 16 Oct 12 ART 714446 00L ...
Page 658: ......