
KW Aufzugstechnik GmbH OPERATING MANUAL DAVID-613
DAVID-D613-V125-E 13.04.2021
Page - 68 -
Availability
Less important / Very important
Age 68ft it facilities
< 10 years / > 10 years
Location
Priority-1 / Priority-2 / Priority-3 / Priority 4
Maintenance display line 01
-
Travel counter
-
Travel counter erasable
-
Travel counter up
-
Travel counter down
-
Change of direction counter
-
Power hour meter
-
Operating-hours meter
-
Operating-hours meter erasable
-
Failure hour counter
-
Door count T1
-
Door count T2
-
Door count T3
-
Energy reference counter
-
Energy feedback meter
-
Temperatur D613-ZR
-
Max. temperature D613-ZR
-
Min. temperature D613-ZR
-
Temperature D613-FKR
-
Max. temperature D613-FKR
-
Min. temperature D613-FKR
-
Temperature control cabinet
-
Max. temperature control cabinet
-
Min. temperature control cabinet
-
Temperature pit-brow
-
Max. temperature pit-brow
-
Min. temperature pit-brow
-
Temperature shaft pit
-
Max. temperature shaft pit
-
Min. temperature shaft pit
-
Humidity control cabinet
-
Max. humidity control cabinet
-
Min. humidity control cabinet
-
Humidity pit-brow
-
Max. Humidity pit-brow
-
Min. Humidity pit-brow
-
Humidity shaft pit
-
Max. humidity shaft pit
-
Min. humidity shaft pit
Maintenance display line 02
-
As with display line 01
Maintenance display line 03
-
As with display line 01
Maintenance display line 04
-
As with display line 01
Maintenance display line 05
-
As with display line 01
……
Maintenance display line 21
-
As with display line 01
D8-Speed
Speed of the cabin in m/s
Speed of U/min Motor
D9- Safe Copy
Status:
-
Normal operation
Relais:
-
Sikr*Zone*Door 1:
State bits:
-
-**- ---- ---- -**--
Zone
-
Length: 400mm
Inspection
-
Only speed control monitoring
Monitoring
-
Nominal speed: 1,2 m/s
Limit switch
-
UP
Limit switch
-
DOWN
Delay control
-
DOWN
Delay control
-
UP
Floors ANTSAFE/LIMAX33CP:
-
04
ANTSAFE-Software:
-
CRC: 7950DE2A
-
CRC: CE7824DD
LIMAX33CP-Software:
-
CRC: 0B55D094
Содержание DAVID 613
Страница 1: ...OPERATING MANUAL LIFT CONTROLLER SYSTEM DAVID 613 FUNCTIONS START UP INSTRUCTIONS...
Страница 2: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 2...
Страница 7: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 7 8 INDEX 263...
Страница 10: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 10...
Страница 12: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 12...
Страница 13: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 13...
Страница 14: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 14...
Страница 34: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 34...
Страница 35: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 35...
Страница 98: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 98...
Страница 124: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 124 Unit shaft copying system...