
KW Aufzugstechnik GmbH OPERATING MANUAL DAVID-613
DAVID-D613-V125-E 13.04.2021
Page - 108 -
B43 – Absolut Copy
1.0 General
The absolute copying represents a digital shaft copying which is operated either without magnet control
or with 3-4 magnet control:
2.0 With one shaft switch / HSK-10 & V-shaft-flag
In this method, the Hall switch HSK01 is used for the detection of zone 71. The second zone 72 is
generated via the absolute value encoder system.
After assembly of the ABS sensor system, the car is parked between floors 1 and 2. After the start of
the learning journey, counting direction and the zones of the floors are learned.
With one shaft switch
After learning, the center of the zone area is assumed to be flush. A correction can be carried out by
entering the difference values for the flattening correction parameter. A change in the position of the
zones must not be carried out after the learning run. A detailed description can be found in chapter
I02-Startup absolute copying of the control manual or the installation instructions.
Delay and pre-limit switch
The delay to enter the station is made using absolute shaft copying.
Type 1:
Connector at ZR-613:
SSI-Encoder Type Schmersal
UPS SSI
Terminal
Function
Colour
Pin 1: PE
Erde
Shield
Pin 2: 91
Clock +
14
Pin 3: 92
Clock -
7
Pin 4: 93
Data +
13
Pin 5: 94
Data -
6
Pin 6: 500
0 V DC
8
Pin 7: 050
+5V DC
Pin 8 : 200
+24V DC
9
Type 2:
Connector at FKR-613:
SSI-Encoder Type p
Wachendorff
WDG-SL00 – ALT
Terminal
Function
Colour
Pin 1: PE
Erde
Shield
Pin 2: 91
Clock +
Lila
Pin 3: 92
Clock -
Yellow
Pin 4: 93
Data +
Gray
Pin 5: 94
Data -
Pink
Pin 6: 500
0 V DC
White
Pin 7: 050
+5V DC
Pin 8: 200
+24V DC
Brown
Содержание DAVID 613
Страница 1: ...OPERATING MANUAL LIFT CONTROLLER SYSTEM DAVID 613 FUNCTIONS START UP INSTRUCTIONS...
Страница 2: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 2...
Страница 7: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 7 8 INDEX 263...
Страница 10: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 10...
Страница 12: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 12...
Страница 13: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 13...
Страница 14: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 14...
Страница 34: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 34...
Страница 35: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 35...
Страница 98: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 98...
Страница 124: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 124 Unit shaft copying system...