
KW Aufzugstechnik GmbH OPERATING MANUAL DAVID-613
DAVID-D613-V125-E 13.04.2021
Page - 56 -
Inspection Speed
Slow, Quick, Vi
Vi
Time to Go Down
Off, 1 to 15 Minutes
10 Min.
Fault Handling
No, Int godown, Block, Block 2.attempt
Travel Down at Overload
No,Yes
No
Signal Top Of Ramp
No,Yes
Yes
Command Down Delay. On
No,Yes 10 – 900 ms.
No
Command Down Delay. Off
No,Yes 10 – 1500 ms.
No
Lock after End-Switch Top
No, Yes
Yes
Liftbus
OFF, KW-Bus, DCP-3
KW BUS
Warm Up travel
OFF, Always active, active on E492
OFF
Warm Up travel after Time
Minutes 5 to 1250
Commands Output
Standard, Oildynamic NGV-A3, Bucher iValve
C.K32 Delay. Off
No, Yes 10 – 3000 ms.
Commando Vi (A177) inverted
For ALGI AZRS! No, Yes
No
B32 Hydraulic Variable Frequency
V0 Delayed Off
No,Yes 10 to 300 ms.
No
Conductor Delayed Off
No,Yes 10 to 5000 ms.
600 ms
Direction Delayed Off
No,Yes 10 to 5000 ms.
1500 ms
Leveling Speed
Vn, V0
Vn
Inspection Speed
V0, Vi
Vinsp.
Time to Go Down
Off, 1 to 15 Minutes
15 Min.
Fault Handling
No, Int godown, Block, Block
2.attempt
No
Travel Down at Overload
No,Yes
No
Lock after Top-End-switch
No,Yes
Yes
Command Output
Standard - Bucher / ALGI - AZFR / ALGI – AZFR V-Insp-DN / Bucher iValve
C. Down Delay. On
No,Yes 10 - 900
No
Liftbus
OFF, KW-Bus, DCP-3,
KW BUS
Warm Up travel
OFF, Always active, active on E492
OFF
Warm Up travel after Time
Minutes 5 to 1250
B33 Rope 2 Speeds
Motor Fan
No, Yes 1 to 600 sec
No
Direction Cond. Delayed On
No,Yes 10 to 300 ms.
100 ms
Inspection Speed
Slow, Quick
slow
Reverse Time out
No,Yes, 1 to 100 ms.
No
B34 Rope Variable Voltage
Liftbus
Off, KW-Bus, DCP-3, DCP-4
Off
Motor Fan
No,Yes 1 to 600 sec.
No
V0 Delayed Off
No,Yes 10 to 300 ms.
No
Direction Delayed Off
No,Yes 10 to 6000 ms.
1900 ms
Main Constructor Delayed off
No,Yes 10 to 5000 ms.
2500 ms
Reveling Speed
Command Vn / Command V0
Vn
Fault Handling
Interrupt, Block, Block 2.attempt
Interrupt
Command Output
Standard-GOLIATH / DIETZ: release, UP/DOWN
B 35 Rope Variable Frequency
Liftbus
Off, KW-Liftbus, DCP-3, DCP-4
KW-Liftbus
Motor Fan
No,Yes 1 to 600 sec.
No
V0 Delayed Off
No,Yes 10 to 300 ms.
No
Direction Delayed Off
No,Yes 10 to 6000 ms.
1900 ms
Main Conductor Delayed Off
No,Yes 10 to 5000 ms.
2500 ms
Releveling Speed
Command Vn / Command V0
Vn
Fault Handling
Interrupt, block, block 2.attempt.
Interrupt
Command Output
Standard-GOLIATH / DIETZ: release, UP/DOWN
V3 delayed on
No / Yes 100 to 6000 ms.
No
V0 delayed
No / Yes 100 to 16000 ms.
No
UP/ Down delayed on
No / Yes 100 to 6000 ms.
No
B4-Shaft Copy
B41 Standart-Copy
Pulse Buffer Delay
10 to 150 ms
50 ms
Correction Travel
After call/ automatic
After call
B42 Relativ Copy
Pulse Buffer Delay
2 to 150 ms
2 ms
Correction Travel to
After call/automatic
After call
2nd Prel. SW bot
No,Yes ER-speaker
No
2nd Prel. SW top
No,Yes ER-speaker
No
Содержание DAVID 613
Страница 1: ...OPERATING MANUAL LIFT CONTROLLER SYSTEM DAVID 613 FUNCTIONS START UP INSTRUCTIONS...
Страница 2: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 2...
Страница 7: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 7 8 INDEX 263...
Страница 10: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 10...
Страница 12: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 12...
Страница 13: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 13...
Страница 14: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 14...
Страница 34: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 34...
Страница 35: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 35...
Страница 98: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 98...
Страница 124: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 124 Unit shaft copying system...