
KW Aufzugstechnik GmbH OPERATING MANUAL DAVID-613
DAVID-D613-V125-E 13.04.2021
Page - 242 -
5.
The freely suspended magnetic tape shows you the po-
sition where you have to mount the sensor on the cabin.
The mounting bracket is already pre-mounted on the
ELGO-CP33 sensor and the screw mounting is included.
Check again whether the chosen mounting position is suit-
able.
6.
Now pass the tape through the sensor. When using the
tape as a reference, align the sensor in the middle.
7.
Now adjust the distance between the tape and the
sensor. For lifting heights up to 50 meters we recom-
mend a distance of approx. 15mm. This offset ensures
that the strip is correctly guided on the steel side during
operation. Make sure that the sensor head is mounted
vertically. Deviations lead to increased wear.
8
.
Further assembly takes place in the shaft pit. Before
entering the pit, ensure that the car is secured against
uncontrolled downward movement. When working for
more than 15 minutes, be sure to wear the car while ob-
serving the safety regulations of the company!
9.
Equivalent to steps 1 and 2, the lower shaft flag holder
1
and the holder
3
for the magnetic tape to be mounted.
Please note that deviating from step 2 the space for a
tension spring
5
must be provided! See right picture!
You need a space of 295mm.
10
. Before you attach the spring, you must mount the
shaft flag holder
2
with the belt breaker
8.
The final loca-
tion will be determined later.
11
. Now you can hook in the spring
5
. Decisive for the
functionality is the spring preload.
It should be 295mm
!
12
. Now it goes on with the exact installation of the strip
breaker
8
:
The tape breaker is used to detect a tearing of the
magnetic tape. The plunger of the switch is pushed
in by the lower band holder and locks in this posi-
tion. As a result, the safety circuit is permanently in-
terrupted.
Содержание DAVID 613
Страница 1: ...OPERATING MANUAL LIFT CONTROLLER SYSTEM DAVID 613 FUNCTIONS START UP INSTRUCTIONS...
Страница 2: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 2...
Страница 7: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 7 8 INDEX 263...
Страница 10: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 10...
Страница 12: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 12...
Страница 13: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 13...
Страница 14: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 14...
Страница 34: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 34...
Страница 35: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 35...
Страница 98: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 98...
Страница 124: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 124 Unit shaft copying system...