
KW Aufzugstechnik GmbH OPERATING MANUAL DAVID-613
DAVID-D613-V125-E 13.04.2021
Page - 45 -
2.13 DESCRIPTION
CONTROLLING-VALVE RV-60-102
& NGV60-101
RV-60-102
The assembly RV-60-102 is used to monitor the control
chart of the type AZRS company ALGI and LRV-DELCON
of the company Bucher.
The configuration is done through the insertion of the relay
K34A for ALGI and by setting the jumper for Bucher.
The connection to the cenral-unit ZR is done by a 9-pole D-
Sub-cable.
Also, the module has the outputs for the drive commands
and directions.
NGV60-101
The module NGV60-101 is used to monitor the control
block GMV Oildynamic NGV A3. The configuration is done
by setting the DAVID control system.
The connection to the ZR-DAVID unit is done by a 9 pin D-
sub-assembly Cable. The module provides the driving
command, direction, feedback and UCM-valve control.
E
art
h
S
peed
-R
el
ev
el
ing
Ru
n-
In S
peed
V
o
H
al
f S
peed
V
1
H
al
f S
peed
V
2
F
ul
l S
peed
V
3
S
peed
I
ns
pek
tion
D
irec
tion U
p
D
irec
tion D
ow
n
0
V G
ND
PE
Vn
V0
V1
V2
V3
Vi
AF
AB
0V
Half Speed
Ö6
Half Speed
B6
Delay Up-Command S2
Delay Up-Command S1
D-Sub-9 Controlling Valve RV60-102
Run-In Speed
G0
0V GND
B12
Quick Up
B1
Slow Up
B2
Quick Down
B3
Slow Down
B4
Bucher Inspection
B5
ALGI Inspection
G5
K31A
K32A
K33A
K35A
K34A
K36A
L
ED Up
L
ED Do
wn
L
ED
Q
ui
ck
LE
D
Ins
pe
ct
ion
LE
D
S
low
LE
D
H
al
f S
ppeed
UCM
-S
ta
tu
s 1
UCM
-S
ta
tu
s 2
Les
s P
res
sur
e
O
ver
pr
es
sur
e
O
ver
load
fr
ee pr
ogr
am
abl
e
C
onr
ol
ler
V
ol
tage +
24
V
V
SM
A
-V
alv
e
V
M
D
D
ow
n V
al
ve
V
SM
A
-V
alv
e
V
M
D
D
ow
n V
al
ve
161
162
171
172
173
174
200
721
722
723
724
D-Sub-9 Controlling Valve NGV60-101
161 200 162 200 171 172 173 174
0V
Auf
V2
V1
Vi
200
500
721
722
723
724
0
V
G
ND
D
irec
tion U
p
S
peed
V2
S
peed
V1
S
peed
Vi
C
ont
rol
ler
V
ol
tage
+
24V
0
V
G
ND
V
SM
A
-V
alv
e
V
M
D
Do
wn
-V
al
ve
V
SM
A
-V
alv
e
V
M
D
Do
wn
- V
alv
e
Содержание DAVID 613
Страница 1: ...OPERATING MANUAL LIFT CONTROLLER SYSTEM DAVID 613 FUNCTIONS START UP INSTRUCTIONS...
Страница 2: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 2...
Страница 7: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 7 8 INDEX 263...
Страница 10: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 10...
Страница 12: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 12...
Страница 13: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 13...
Страница 14: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 14...
Страница 34: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 34...
Страница 35: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 35...
Страница 98: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 98...
Страница 124: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 124 Unit shaft copying system...