
KW Aufzugstechnik GmbH OPERATING MANUAL DAVID-613
DAVID-D613-V125-E 13.04.2021
Page - 250 -
4.0 STEP-3: Safecopying – Teach Zones
Navigate with arrow keys and select the
menu item with
ENTER.
Use yellow keys + or -
to navigate and
enter
"yes
"
Note:
Elevator moves 2x all floors. After-
wards, the status of the LIMAX-CP33 sys-
tem is in "normal operation" and all zones
are output and monitored.
Warning!
If the Step-3 is not closed successfully, there is a message like „Out of
Order“ in the displays and all 25 Seconds a warning-signals appeares!
A Normal-operation is NOT possible!
4.1 Setting the readjustment
Before activating readjustment, you must make the following pa-
rameter settings in menu B17 readjustment:
7.1
In the parameter Max. Catch-up distance you set the length of the catch-up path. The catch-
up distance should always be shorter than half the zone area. Please also note the following
facts: The zone area must be set so that it is shorter, such as the length of the door sash.
7.2
In the Parameter
Tolerance Recalculate
you set the starting point for the beginning of the
retrieval. As a default, you should not go below 5 - 10mm, as otherwise existing rope vibra-
tions lead to unnecessary readjustment.
If the above entries have been made, the parameter
Catch-Up
can be activated.
4.2 ELGO LIMAX CP33 -Copy – Error handling
If the LIMAX33 detects a serious error and locks, this state can only be reset by a RESET
command for safety reasons. This can be done on the D613 by briefly changing the state of
the inspection or return switch.
This will send a RESET command to the LIMAX33CP via the CANopen protocol and this will
reboot.
Содержание DAVID 613
Страница 1: ...OPERATING MANUAL LIFT CONTROLLER SYSTEM DAVID 613 FUNCTIONS START UP INSTRUCTIONS...
Страница 2: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 2...
Страница 7: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 7 8 INDEX 263...
Страница 10: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 10...
Страница 12: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 12...
Страница 13: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 13...
Страница 14: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 14...
Страница 34: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 34...
Страница 35: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 35...
Страница 98: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 98...
Страница 124: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 124 Unit shaft copying system...