
KW Aufzugstechnik GmbH OPERATING MANUAL DAVID-613
DAVID-D613-V125-E 13.04.2021
Page - 218 -
1. Line Number of journeys.:
xxxxxxxxx
2. Line Operating hours.:
xxxxxx:xx:xx
3. Line Door movement.:
4. Line Messages e.G. Maintenance in
xxx Days
3. Gateway
The parameter set is transmitted via the serial connection to the gateways.
4. Operator app
The operator app, which is being planned, makes it possible to transfer the maintenance messages to
the smartphone via the WLAN gateway of the controller.
D8 speeds
Submenu D8 shows the speeds of the car and the machine.
Speed elevator car
In m/s
Speed of the drive
In U/min
D9 Safecopy
The menu D9 is used to quickly get an overview of the function and the configuration of the connected SAFE sys-
tem. There can be no parameters set there.
D9 Status:
D9 Status:
Normal operation
Normal operation
menu
Display of the state of the safe copy. The
following states are possible:
Normal operation: ANTSSAFE works flawlessly
Wait reset: ANTSSAFE has become due to an
Error locked. Reset dur. New start
Setup-1: The ANTSAFE was not yet configured
Setup-2: The first part of the basic configuration
was carried out
Setup-3: The second part of the basic configuration
was carried out.
system off:
ANTSSAFE not available
system ini:
state during power up
system start: state during power up
D9 Relay
D9 Relais:
SiKr:* zone:* Door:-
Normal operation
m
enu
* =: Closed/ active
- =: Open / deactive
Display of the switching position of the follow-
ing relays SiKr, door zone & door lock.
Sikr:*/-
If "*" then the safety circuit is
closed, the system is ready to
drive
Zone: */-
If "*" then the zone area is out-
put, the cabin is in the door
zone area
Tür: */-
If "*" then the safety relay for
the door override has been ac-
tivated
Содержание DAVID 613
Страница 1: ...OPERATING MANUAL LIFT CONTROLLER SYSTEM DAVID 613 FUNCTIONS START UP INSTRUCTIONS...
Страница 2: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 2...
Страница 7: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 7 8 INDEX 263...
Страница 10: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 10...
Страница 12: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 12...
Страница 13: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 13...
Страница 14: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 14...
Страница 34: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 34...
Страница 35: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 35...
Страница 98: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 98...
Страница 124: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 124 Unit shaft copying system...