GE Multilin
C70 Capacitor Bank Protection and Control System
6-17
6 ACTUAL VALUES
6.3 METERING
6
6.3.4 CAPACITOR BANK
a) MAIN MENU
PATH: ACTUAL VALUES
ÖØ
METERING
ÖØ
CAPACITOR BANK
The capacitor bank menu contains the actual values for the voltage differenital, neutral voltage unbalance, phase current
unbalance, and neutral current unbalance elements.
b) VOLTAGE DIFFERENTIAL
PATH: ACTUAL VALUES
ÖØ
METERING
ÖØ
CAPACITOR BANK
Ö
VOLTAGE DIFFERENTIAL
Ö
VOLTAGE DIFFERENTIAL 1(3)
These actual values display the bus and differential signals in per-unit values of the nominal bus voltage for phases A, B,
and C.
c) NEUTRAL VOLTAGE UNBALANCE
PATH: ACTUAL VALUES
ÖØ
METERING
ÖØ
CAPACITOR BANK
Ö
NEUTRAL VOLTAGE...
Ö
NEUTRAL VOLTAGE UNBALANCE 1(3)
The magnitudes (in pu) and angles of the neutral point and bus V0 voltages for the neutral voltage unbalance elements are
displayed in this menu. The magnitudes of the compensating operating voltage and restraining voltage (in pu) are also dis-
played.
d) PHASE CURRENT UNBALANCE
PATH: ACTUAL VALUES
ÖØ
METERING
ÖØ
CAPACITOR BANK
Ö
PHASE CURRENT...
Ö
PHASE CURRENT UNBALANCE 1(3)
CAPACITOR BANK
VOLTAGE
DIFFERENTIAL
MESSAGE
NEUTRAL VOLTAGE
UNBALANCE
MESSAGE
PHASE CURRENT
UNBALANCE
MESSAGE
NEUTRAL CURRENT
UNBALANCE
VOLTAGE
DIFFERENTIAL 1
Bus Va:
0.0000 pu
Dif Va:
0.0000 pu
MESSAGE
Bus Vb:
0.0000 pu
Dif Vb:
0.0000 pu
MESSAGE
Bus Vc:
0.0000 pu
Dif Vc:
0.0000 pu
NEUTRAL VOLTAGE
UNBALANCE 1
NEUTRAL-POINT Vx:
0.0000 pu / 0.0°
MESSAGE
BUS V0:
0.0000 pu / 0.0°
MESSAGE
Vop:
0.0000 pu
Vrest:
0.0000 pu
PHASE CURRENT
UNBALANCE 1
Raw Id A:
0.0000 pu
Cm Iop A:
0.0000 pu
MESSAGE
Raw Id B:
0.0000 pu
Cm Iop B:
0.0000 pu
MESSAGE
Raw Id C:
0.0000 pu
Cm Iop C:
0.0000 pu
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...