GE Multilin
C70 Capacitor Bank Protection and Control System
C-27
APPENDIX C
C.7 LOGICAL NODES
C
RSYN
: Synchronism-check or synchronizing
---
C: LOGICAL NODES FOR CONTROL
CALH
: Alarm handling
---
CCGR
: Cooling group control
---
CILO
: Interlocking
---
CPOW
: Point-on-wave switching
---
CSWI
: Switch controller
Yes
G: LOGICAL NODES FOR GENERIC REFERENCES
GAPC
: Generic automatic process control
---
GGIO
: Generic process I/O
Yes
GSAL
: Generic security application
---
I: LOGICAL NODES FOR INTERFACING AND ARCHIVING
IARC
: Archiving
---
IHMI
: Human machine interface
---
ITCI
: Telecontrol interface
---
ITMI
: Telemonitoring interface
---
A: LOGICAL NODES FOR AUTOMATIC CONTROL
ANCR
: Neutral current regulator
---
ARCO
: Reactive power control
---
ATCC
: Automatic tap changer controller
---
AVCO
: Voltage control
---
M: LOGICAL NODES FOR METERING AND MEASUREMENT
MDIF
: Differential measurements
---
MHAI
: Harmonics or interharmonics
---
MHAN
: Non phase related harmonics or interharmonic
---
MMTR
: Metering
---
MMXN
: Non phase related measurement
Yes
MMXU
: Measurement
Yes
MSQI
: Sequence and imbalance
---
MSTA
: Metering statistics
---
S: LOGICAL NODES FOR SENSORS AND MONITORING
SARC
: Monitoring and diagnostics for arcs
---
SIMG
: Insulation medium supervision (gas)
---
SIML
: Insulation medium supervision (liquid)
---
SPDC
: Monitoring and diagnostics for partial discharges
---
X: LOGICAL NODES FOR SWITCHGEAR
XCBR
: Circuit breaker
Yes
XSWI
: Circuit switch
Yes
T: LOGICAL NODES FOR INSTRUMENT TRANSFORMERS
TCTR
: Current transformer
---
TVTR
: Voltage transformer
---
Y: LOGICAL NODES FOR POWER TRANSFORMERS
YEFN
: Earth fault neutralizer (Peterson coil)
---
YLTC
: Tap changer
---
YPSH
: Power shunt
---
YPTR
: Power transformer
---
Table C–1: IEC 61850 LOGICAL NODES (Sheet 2 of 3)
NODES
UR-FAMILY
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...