A-30
C70 Capacitor Bank Protection and Control System
GE Multilin
A.1 PARAMETER LISTS
APPENDIX A
A
13587
RTD Inputs 36 Value
---
RTD input 36 actual value
13588
RTD Inputs 37 Value
---
RTD input 37 actual value
13589
RTD Inputs 38 Value
---
RTD input 38 actual value
13590
RTD Inputs 39 Value
---
RTD input 39 actual value
13591
RTD Inputs 40 Value
---
RTD input 40 actual value
13592
RTD Inputs 41 Value
---
RTD input 41 actual value
13593
RTD Inputs 42 Value
---
RTD input 42 actual value
13594
RTD Inputs 43 Value
---
RTD input 43 actual value
13595
RTD Inputs 44 Value
---
RTD input 44 actual value
13596
RTD Inputs 45 Value
---
RTD input 45 actual value
13597
RTD Inputs 46 Value
---
RTD input 46 actual value
13598
RTD Inputs 47 Value
---
RTD input 47 actual value
13599
RTD Inputs 48 Value
---
RTD input 48 actual value
13824
60P 1 Raw Idiff A
Amps
Phase current balance raw phase A differential current actual value
13826
60P 1 Raw Idiff B
Amps
Phase current balance raw phase B differential current actual value
13828
60P 1 Raw Idiff C
Amps
Phase current balance raw phase C differential current actual value
13830
60P 1 Comp Iop A
Amps
Phase current balance composite phase A operating current actual value
13832
60P 1 Comp Iop B
Amps
Phase current balance composite phase B operating current actual value
13834
60P 1 Comp Iop C
Amps
Phase current balance composite phase C operating current actual value
14020
60N 1 Raw INsp
Amps
Neutral current unbalance INsp actual value
14022
60N 1 Comp Iop
Amps
Neutral current unbalance Iop actual value
14064
59NU1Ntrl-p Vx Ang
Angle
Neutral voltage unbalance neutral-point Vx angle
14066
59NU1Bus V0 Ang
Angle
Neutral voltage unbalance neutral-point Vx bus V0 angle
14068
59NU1Bus V0 Mag
Volts
Neutral voltage unbalance neutral-point Vx bus V0 magnitude
14070
59NU1Ntrl-p Vx Mag
Volts
Neutral voltage unbalance neutral-point Vx magnitude
14072
59NU1Vop
Volts
Neutral voltage unbalance neutral-point Vx operating voltage
14074
59NU1Vrest
Volts
Neutral voltage unbalance neutral-point Vx restraining voltage
14112
SecondOfDay
---
Integer number of seconds past midnight (1000 seconds = 1 pu)
14114
DayOfMonth
---
Day of the current month (1 day = 1 pu)
14115
DayOfYear
---
Integer number of day of year (Julian date. 5 days = 1 pu)
14116
Year
---
Time of day, year (100 years = 1 pu)
14432
CAP 1 DISCHRG TIME
seconds
Capacitor control discharge time in seconds
24459
Active Setting Group
---
Current setting group
25451
59B 1 Vop A
Volts
Bank overvoltage 1 Vop phase A
25452
59B 1 Vop B
Volts
Bank overvoltage 1 Vop phase B
25453
59B 1 Vop C
Volts
Bank overvoltage 1 Vop phase C
25454
59B 2 Vop A
Volts
Bank overvoltage 2 Vop phase A
25455
59B 2 Vop B
Volts
Bank overvoltage 2 Vop phase B
25456
59B 2 Vop C
Volts
Bank overvoltage 2 Vop phase C
25457
59B 3 Vop A
Volts
Bank overvoltage 3 Vop phase A
25458
59B 3 Vop B
Volts
Bank overvoltage 3 Vop phase B
25459
59B 3 Vop C
Volts
Bank overvoltage 3 Vop phase C
32768
Tracking Frequency
Hz
Tracking frequency
39425
FlexElement 1 Value
---
FlexElement™ 1 actual value
39427
FlexElement 2 Value
---
FlexElement™ 2 actual value
39429
FlexElement 3 Value
---
FlexElement™ 3 actual value
39431
FlexElement 4 Value
---
FlexElement™ 4 actual value
Table A–1: FLEXANALOG DATA ITEMS (Sheet 30 of 31)
ADDRESS
FLEXANALOG NAME
UNITS
DESCRIPTION
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...