![GE UR Series C70 Скачать руководство пользователя страница 377](http://html.mh-extra.com/html/ge/ur-series-c70/ur-series-c70_instruction-manual_130387377.webp)
GE Multilin
C70 Capacitor Bank Protection and Control System
7-11
7 COMMANDS AND TARGETS
7.2 TARGETS
7
If none of these apply, then contact the factory.
•
Latched target message
: No.
•
Description of problem
: An Ethernet connection has failed.
•
How often the test is performed
: Monitored every five seconds.
•
What to do
: Check Ethernet connections. Port 1 is the primary port and port 2 is the secondary port.
•
Latched target message
: No.
•
Description of problem
: The SNTP server is not responding.
•
How often the test is performed
: Every 10 to 60 seconds.
•
What to do
: Check SNTP configuration and network connections.
•
Latched target message
: No.
•
Description of problem
: A discrepancy has been detected between the actual and desired state of a latching contact
output of an installed type “4L” module.
•
How often the test is performed
: Upon initiation of a contact output state change.
•
What to do
: Verify the state of the output contact and contact the factory if the problem persists.
•
Latched target message
: No.
•
Description of problem
: A data item in a configurable GOOSE data set is oscillating.
•
How often the test is performed
: Upon scanning of each configurable GOOSE data set.
•
What to do
: The “xxx” text denotes the data item that has been detected as oscillating. Evaluate all logic pertaining to
this item.
•
Latched target message
: No.
•
Description of problem
: A direct device is configured but not connected.
•
How often the test is performed
: Every second.
•
What to do
: Check direct input and output configuration and wiring.
•
Latched target message
: No.
•
Description of problem
: One or more GOOSE devices are not responding.
MAINTENANCE ALERT:
Port ## Failure
MAINTENANCE ALERT:
SNTP Failure
MAINTENANCE ALERT:
4L Discrepancy
MAINTENANCE ALERT:
GGIO Ind xxx oscill
DIRECT I/O FAILURE:
COMM Path Incomplete
REMOTE DEVICE FAIL:
COMM Path Incomplete
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...