GE Multilin
C70 Capacitor Bank Protection and Control System
5-193
5 SETTINGS
5.7 CONTROL ELEMENTS
5
•
The current is initially interrupted.
•
The breaker status is open.
•
An elevated high frequency current condition occurs and the current subsequently drops out again.
The algorithm is illustrated in the state machine diagram shown below.
Figure 5–98: ALGORITHM ILLUSTRATION – STATE MACHINE TO DETECT RESTRIKE
In this way, a distinction is made between a self-extinguishing restrike and permanent breaker failure condition. The latter
can be detected by the breaker failure function or a regular instantaneous overcurrent element. Also, a fast succession of
restrikes will be picked up by breaker failure or instantaneous overcurrent protection.
The following settings are available for each element.
•
BREAKER RESTRIKE 1 FUNCTION
: This setting enable and disables operation of the breaker restrike detection ele-
ment.
•
BRK RSTR 1 BLOCK
: This setting is used to block operation of the breaker restrike detection element.
•
BREAKER RESTRIKE 1 SOURCE
: This setting selects the source of the current for this element. This source must
have a valid CT bank assigned.
•
BREAKER RESTRIKE 1 PICKUP
: This setting specifies the pickup level of the overcurrent detector in per-unit values
of CT nominal current.
•
BREAKER RESTRIKE 1 RESET DELAY
: This setting specifies the reset delay for this element. When set to “0 ms”,
then FlexLogic™ operand will be picked up for only 1/8th of the power cycle.
•
BRK RSTR 1 BRK OPEN
: This setting assigns a FlexLogic™ operand indicating the open position of the breaker. It
must be logic “1” when breaker is open.
•
BRK RSTR 1 OPEN CMD
: This setting assigns a FlexLogic™ operand indicating a breaker open command. It must be
logic “1” when breaker is opened, either manually or from protection logic.
•
BRK RSTR 1 CLS CMD
: This setting assigns a FlexLogic™ operand indicating a breaker close command. It must be
logic “1” when breaker is closed.
Capacitor bank
offline
Current
interruption
(overcurrent)
High-frequency
elevated current
Restrike detected:
OP state asserted
Breaker close
Breaker
close
Breaker
close
Capacitor bank
online
Current
interruption
(overcurrent)
Breaker open
command or breaker
open state
834768A1.CDR
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...