![GE UR Series C70 Скачать руководство пользователя страница 315](http://html.mh-extra.com/html/ge/ur-series-c70/ur-series-c70_instruction-manual_130387315.webp)
GE Multilin
C70 Capacitor Bank Protection and Control System
5-191
5 SETTINGS
5.7 CONTROL ELEMENTS
5
tion elements, breaker failure, and close and trip commands. A six-cycle time delay applies after the selected Flex-
Logic™ operand resets.
•
BRK FLSHOVR PKP DELAY
: This setting specifies the time delay to operate after a pickup condition is detected.
Figure 5–96: BREAKER FLASHOVER SCHEME LOGIC
842018A2.CDR
AND
AND
AND
SET
dominant
RESET
SET
dominant
RESET
OR
OR
OR
OR
OR
BREAKER FLASHOVER
FUNCTION:
BRK 1 FLSHOVR V PKP:
BRK 1 STATUS CLSD A:
BRK 1 FLSHOVR PKP
DELAY:
BRK 1 FLSHOVR DPO A
BRK 1 FLSHOVR PKP A
BRK 1 FLSHOVR OP
BRK 1 FLSHOVR PKP
BRK 1 FLSHOVR DPO
BRK 1 FLSHOVR OP A
BRK 1 FLSHOVR DPO B
BRK 1 FLSHOVR PKP B
BRK 1 FLSHOVR OP B
BRK 1 FLSHOVR DPO C
BRK 1 FLSHOVR PKP C
BRK 1 FLSHOVR OP C
BRK 1 FLSHOVR SUPV A:
BRK 1 STATUS CLSD B:
BRK 1 FLSHOVR SUPV B:
BRK 1 STATUS CLSD C:
BRK 1 FLSHOVR SUPV C:
BRK 1 FLSHOVR AMP PKP:
BRK 1 FLSHOVR DIFF V
PKP:
BRK 1 FLSHOVR SIDE 1
SRC:
BRK 1 FLSHOVR SIDE 2
SRC:
Enable=1
RUN
RUN
RUN
RUN
RUN
RUN
SRC 1, SRC 2, … , SRC 6
SRC 1 SRC 2
SRC 6
,
, … ,
, none
VB
Vb
IB
Block: OFF=0
VA > PKP
FlexLogic operand: On=1
FlexLogic operand: Off=0
FlexLogic operand: On=1
FlexLogic operand: Off=0
Phase B
logic
Phase B
logic
Phase B logic
Phase B logic
Phase C
logic
Phase C
logic
Phase C logic
Phase C logic
FlexLogic operand: On=1
FlexLogic operand: Off=0
IA > PKP
VA > PKP
Va > PKP
VA
Va
IA
VC
Vc
|
|
VA = VA - Va
IC
SETTING
SETTING
SETTINGS
SETTING
FLEXLOGIC OPERANDS
FLEXLOGIC OPERANDS
FLEXLOGIC OPERAND
FLEXLOGIC OPERANDS
FLEXLOGIC OPERANDS
SETTINGS
SETTING
SETTING
SETTINGS
SETTINGS
0
0
5 cycle
tPKP
0
0
5 cycle
6 cycle
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...