GE Multilin
C70 Capacitor Bank Protection and Control System
5-89
5 SETTINGS
5.5 FLEXLOGIC™
5
ELEMENT:
Time of day timer
month
MONTH JANUARY
MONTH FEBRUARY
MONTH MARCH
MONTH APRIL
MONTH MAY
MONTH JUNE
MONTH JULY
MONTH AUGUST
MONTH SEPTEMBER
MONTH OCTOBER
MONTH NOVEMBER
MONTH DECEMBER
Current month is January
Current month is February
Current month is March
Current month is April
Current month is May
Current month is June
Current month is July
Current month is August
Current month is September
Current month is October
Current month is November
Current month is December
ELEMENT:
Negative-sequence
instantaneous
overcurrent
NEG SEQ IOC1 PKP
NEG SEQ IOC1 OP
NEG SEQ IOC1 DPO
Negative-sequence instantaneous overcurrent 1 has picked up
Negative-sequence instantaneous overcurrent 1 has operated
Negative-sequence instantaneous overcurrent 1 has dropped out
NEG SEQ IOC2
Same set of operands as shown for NEG SEQ IOC1
ELEMENT:
Negative-sequence
overvoltage
NEG SEQ OV1 PKP
NEG SEQ OV1 DPO
NEG SEQ OV1 OP
Negative-sequence overvoltage element has picked up
Negative-sequence overvoltage element has dropped out
Negative-sequence overvoltage element has operated
NEG SEQ OV2...
Same set of operands as shown for NEG SEQ OV1
ELEMENT:
Negative-sequence
time overcurrent
NEG SEQ TOC1 PKP
NEG SEQ TOC1 OP
NEG SEQ TOC1 DPO
Negative-sequence time overcurrent 1 has picked up
Negative-sequence time overcurrent 1 has operated
Negative-sequence time overcurrent 1 has dropped out
NEG SEQ TOC2
Same set of operands as shown for NEG SEQ TOC1
ELEMENT:
Neutral
instantaneous
overcurrent
NEUTRAL IOC1 PKP
NEUTRAL IOC1 OP
NEUTRAL IOC1 DPO
Neutral instantaneous overcurrent 1 has picked up
Neutral instantaneous overcurrent 1 has operated
Neutral instantaneous overcurrent 1 has dropped out
NEUTRAL IOC2 to IOC12
Same set of operands as shown for NEUTRAL IOC1
ELEMENT:
Neutral overvoltage
NEUTRAL OV1 PKP
NEUTRAL OV1 DPO
NEUTRAL OV1 OP
Neutral overvoltage element 1 has picked up
Neutral overvoltage element 1 has dropped out
Neutral overvoltage element 1 has operated
ELEMENT:
Neutral time
overcurrent
NEUTRAL TOC1 PKP
NEUTRAL TOC1 OP
NEUTRAL TOC1 DPO
Neutral time overcurrent 1 has picked up
Neutral time overcurrent 1 has operated
Neutral time overcurrent 1 has dropped out
NEUTRAL TOC2 to TOC6
Same set of operands as shown for NEUTRAL TOC1
ELEMENT:
Neutral current
unbalance
NTRL CUR 1 STG1 PKP
NTRL CUR 1 STG2 PKP
NTRL CUR 1 STG3 PKP
NTRL CUR 1 STG4 PKP
NTRL CUR 1 PKP
NTRL CUR 1 DPO
NTRL CUR 1 STG1 OP
NTRL CUR 1 STG2 OP
NTRL CUR 1 STG3 OP
NTRL CUR 1 STG4 OP
NTRL CUR 1 OP
Neutral current unbalance element 1 picked up in stage 1
Neutral current unbalance element 1 picked up in stage 2
Neutral current unbalance element 1 picked up in stage 3
Neutral current unbalance element 1 picked up in stage 4
Neutral current unbalance element 1 picked up
Neutral current unbalance element 1 dropped out
Neutral current unbalance element 1 operated in stage 1
Neutral current unbalance element 1 operated in stage 2
Neutral current unbalance element 1 operated in stage 3
Neutral current unbalance element 1 operated in stage 4
Neutral current unbalance element 1 operated
NTRL CUR 2 to NTRL CUR 3
Same set of operands as shown for NTRL CUR 1
ELEMENT:
Neutral directional
overcurrent
NTRL DIR OC1 FWD
NTRL DIR OC1 REV
Neutral directional overcurrent 1 forward has operated
Neutral directional overcurrent 1 reverse has operated
ELEMENT:
Neutral voltage
unbalance
NTRL VOLT 1 STG1 PKP
NTRL VOLT 1 STG2 PKP
NTRL VOLT 1 STG3 PKP
NTRL VOLT 1 STG4 PKP
NTRL VOLT 1 PKP
NTRL VOLT 1 DPO
NTRL VOLT 1 STG1 OP
NTRL VOLT 1 STG2 OP
NTRL VOLT 1 STG3 OP
NTRL VOLT 1 STG4 OP
NTRL VOLT 1 OP
Neutral voltage unbalance element 1 picked up in stage 1
Neutral voltage unbalance element 1 picked up in stage 2
Neutral voltage unbalance element 1 picked up in stage 3
Neutral voltage unbalance element 1 picked up in stage 4
Neutral voltage unbalance element 1 picked up
Neutral voltage unbalance element 1 dropped out
Neutral voltage unbalance element 1 operated in stage 1
Neutral voltage unbalance element 1 operated in stage 2
Neutral voltage unbalance element 1 operated in stage 3
Neutral voltage unbalance element 1 operated in stage 4
Neutral voltage unbalance element 1 operated
NTRL VOLT 2 to NTRL VOLT 3
Same set of operands as shown for NTRL VOLT 1
Table 5–8: C70 FLEXLOGIC™ OPERANDS (Sheet 4 of 8)
OPERAND TYPE
OPERAND SYNTAX
OPERAND DESCRIPTION
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...