5-142
C70 Capacitor Bank Protection and Control System
GE Multilin
5.6 GROUPED ELEMENTS
5 SETTINGS
5
c) GROUND INSTANTANEOUS OVERCURRENT
(ANSI 50G)
PATH: SETTINGS
ÖØ
GROUPED ELEMENTS
Ö
SETTING GROUP 1(6)
ÖØ
GROUND CURRENT
ÖØ
GROUND IOC1(12)
The ground instantaneous overcurrent element may be used as an instantaneous element with no intentional delay or as a
definite time element. The ground current input is the quantity measured by the ground input CT and is the fundamental
phasor magnitude.
These elements measure the current that is connected to the ground channel of a CT/VT module. The conversion
range of a standard channel is from 0.02 to 46 times the CT rating.
Figure 5–65: GROUND IOC1 SCHEME LOGIC
GROUND IOC1
GROUND IOC1
FUNCTION: Disabled
Range: Disabled, Enabled
MESSAGE
GROUND IOC1 SIGNAL
SOURCE: SRC 1
Range: SRC 1, SRC 2
MESSAGE
GROUND IOC1
PICKUP: 1.000
pu
Range: 0.000 to 30.000 pu in steps of 0.001
MESSAGE
GROUND IOC1 PICKUP
DELAY: 0.00
s
Range: 0.00 to 600.00 s in steps of 0.01
MESSAGE
GROUND IOC1 RESET
DELAY: 0.00
s
Range: 0.00 to 600.00 s in steps of 0.01
MESSAGE
GROUND IOC1 BLOCK:
Off
Range: FlexLogic™ operand
MESSAGE
GROUND IOC1
TARGET: Self-reset
Range: Self-reset, Latched
,
Disabled
MESSAGE
GROUND IOC1
EVENTS: Disabled
Range: Disabled, Enabled
NOTE
S
ETT
I
NG
GROUND IOC1
FUNCTION:
Disabled = 0
Enabled = 1
S
ETT
I
NG
GROUND IOC1
SOURCE:
IG
GROUND IOC1
BLOCK:
Off = 0
FLEXLOG
I
C OPE
R
AND
S
GROUND IOIC DPO
GROUND IOC1 OP
S
ETT
I
NG
S
ETT
I
NG
IG
≥
PICKUP
GROUND IOC1
PICKUP:
RUN
GROUND IOC1 PICKUP
DELAY:
S
ETT
I
NG
S
GROUND IOC1 RESET
DELAY:
t
PKP
t
RST
827037A4.VSD
AND
GROUND IOC1 PKP
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...