5-40
C70 Capacitor Bank Protection and Control System
GE Multilin
5.2 PRODUCT SETUP
5 SETTINGS
5
The source harmonic indices appear as oscillography analog channels numbered from 0 to 23. These correspond
directly to the to the 2nd to 25th harmonics in the relay as follows:
Analog channel 0
↔
2nd harmonic
Analog channel 1
↔
3rd harmonic
...
Analog channel 23
↔
25th harmonic
5.2.9 DATA LOGGER
PATH: SETTINGS
ÖØ
PRODUCT SETUP
ÖØ
DATA LOGGER
The data logger samples and records up to 16 analog parameters at a user-defined sampling rate. This recorded data may
be downloaded to EnerVista UR Setup and displayed with
parameters
on the vertical axis and
time
on the horizontal axis.
All data is stored in non-volatile memory, meaning that the information is retained when power to the relay is lost.
For a fixed sampling rate, the data logger can be configured with a few channels over a long period or a larger number of
channels for a shorter period. The relay automatically partitions the available memory between the channels in use. Exam-
ple storage capacities for a system frequency of 60 Hz are shown in the following table.
DATA LOGGER
DATA LOGGER MODE:
Continuous
Range: Continuous, Trigger
MESSAGE
DATA LOGGER TRIGGER:
Off
Range: FlexLogic™ operand
MESSAGE
DATA LOGGER RATE:
60000 ms
Range: 15 to 3600000 ms in steps of 1
MESSAGE
DATA LOGGER CHNL
1:
Off
Range: Off, any FlexAnalog parameter. See Appendix A:
FlexAnalog Parameters for complete list.
MESSAGE
DATA LOGGER CHNL
2:
Off
Range: Off, any FlexAnalog parameter. See Appendix A:
FlexAnalog Parameters for complete list.
↓
MESSAGE
DATA LOGGER CHNL 16:
Off
Range: Off, any FlexAnalog parameter. See Appendix A:
FlexAnalog Parameters for complete list.
MESSAGE
DATA LOGGER CONFIG:
0 CHNL x
0.0 DAYS
Range: Not applicable - shows computed data only
NOTE
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...