5-24
C70 Capacitor Bank Protection and Control System
GE Multilin
5.2 PRODUCT SETUP
5 SETTINGS
5
The GOOSE functionality was enhanced to prevent the relay from flooding a communications network with GOOSE mes-
sages due to an oscillation being created that is triggering a message.
The C70 has the ability of detecting if a data item in one of the GOOSE datasets is erroneously oscillating. This can be
caused by events such as errors in logic programming, inputs improperly being asserted and de-asserted, or failed station
components. If erroneously oscillation is detected, the C70 will stop sending GOOSE messages from the dataset for a min-
imum period of one second. Should the oscillation persist after the one second time-out period, the C70 will continue to
block transmission of the dataset. The C70 will assert the
MAINTENANCE ALERT: GGIO Ind XXX oscill
self-test error mes-
sage on the front panel display, where
XXX
denotes the data item detected as oscillating.
For versions 5.70 and higher, the C70 supports four retransmission schemes: aggressive, medium, relaxed, and heartbeat.
The aggressive scheme is only supported in fast type 1A GOOSE messages (GOOSEOut 1 and GOOSEOut 2). For slow
GOOSE messages (GOOSEOut 3 to GOOSEOut 8) the aggressive scheme is the same as the medium scheme.
The details about each scheme are shown in the following table.
The configurable GOOSE feature is recommended for applications that require GOOSE data transfer between UR-series
IEDs and devices from other manufacturers. Fixed GOOSE is recommended for applications that require GOOSE data
transfer between UR-series IEDs.
IEC 61850 GOOSE messaging contains a number of configurable parameters, all of which must be correct to achieve the
successful transfer of data. It is critical that the configured datasets at the transmission and reception devices are an exact
match in terms of data structure, and that the GOOSE addresses and name strings match exactly. Manual configuration is
possible, but third-party substation configuration software may be used to automate the process. The EnerVista UR Setup
software can produce IEC 61850 ICD files and import IEC 61850 SCD files produced by a substation configurator (refer to
the
IEC 61850 IED configuration
section later in this appendix).
The following example illustrates the configuration required to transfer IEC 61850 data items between two devices. The
general steps required for transmission configuration are:
Table 5–1: GOOSE RETRANSMISSION SCHEMES
SCHEME
SQ NUM
TIME FROM THE
EVENT
TIME BETWEEN
MESSAGES
COMMENT
TIME ALLOWED TO LIVE
IN MESSAGE
Aggressive
0
0 ms
0 ms
Event
2000 ms
1
4 ms
4 ms
T1
2000 ms
2
8 ms
4 ms
T1
2000 ms
3
16 ms
8 ms
T2
Heartbeat * 4, 5
4
Heartbeat
Heartbeat
T0
Heartbeat * 4, 5
5
Heartbeat
Heartbeat
T0
Heartbeat * 4, 5
Medium
0
0 ms
0 ms
Event
2000 ms
1
16 ms
16 ms
T1
2000 ms
2
32 ms
16 ms
T1
2000 ms
3
64 ms
32 ms
T2
Heartbeat * 4, 5
4
Heartbeat
Heartbeat
T0
Heartbeat * 4, 5
5
Heartbeat
Heartbeat
T0
Heartbeat * 4, 5
Relaxed
0
0 ms
0 ms
Event
2000 ms
1
100 ms
100 ms
T1
2000 ms
2
200 ms
100 ms
T1
2000 ms
3
700 ms
500 ms
T2
Heartbeat * 4, 5
4
Heartbeat
Heartbeat
T0
Heartbeat * 4, 5
5
Heartbeat
Heartbeat
T0
Heartbeat * 4, 5
Heartbeat
0
0 ms
0 ms
Event
2000 ms
1
Heartbeat
Heartbeat
T1
2000 ms
2
Heartbeat
Heartbeat
T1
2000 ms
3
Heartbeat
Heartbeat
T2
Heartbeat * 4, 5
4
Heartbeat
Heartbeat
T0
Heartbeat * 4, 5
5
Heartbeat
Heartbeat
T0
Heartbeat * 4, 5
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...