GE Multilin
C70 Capacitor Bank Protection and Control System
4-11
4 HUMAN INTERFACES
4.2 EXTENDED ENERVISTA UR SETUP FEATURES
4
1.
The transfer date of a setting file written to a C70 is logged in the relay and can be viewed via EnerVista UR Setup or
the front panel display. Likewise, the transfer date of a setting file saved to a local PC is logged in EnerVista UR Setup.
2.
Comparing the dates stored in the relay and on the settings file at any time in the future will indicate if any changes
have been made to the relay configuration since the settings file was saved.
a) SETTINGS FILE TRACEABILITY INFORMATION
The serial number and file transfer date are saved in the settings files when they sent to an C70 device.
The C70 serial number and file transfer date are included in the settings file device definition within the EnerVista UR Setup
offline window as shown in the example below.
Figure 4–12: DEVICE DEFINITION SHOWING TRACEABILITY DATA
This information is also available in printed settings file reports as shown in the example below.
Figure 4–13: SETTINGS FILE REPORT SHOWING TRACEABILITY DATA
Traceability data in settings
file device definition
842863A1.CDR
Traceability data
in settings report
842862A1.CDR
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...