![WinGD X82-B Maintenance Manual Download Page 81](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581081.webp)
PROCEDURE
1
Make sure that the pressure in all pipes is released.
2
Make sure that you know the procedure for the access to engine spaces, refer to the
Operation Manual.
3
Make sure that no personnel and components are in the danger areas (crankcase,
piston underside, propeller shaft, etc.).
4
Prevent the crankshaft from turning.
4.1
Engage the turning gear and make sure that the lever is locked.
4.2
If necessary, do more related work.
NOTE:
Water current (for instance if the ship is tugged) can cause the
propeller shaft to turn.
5
Make sure the all related spaces have good airflow, for example if CO
2
was used to
extinguish a fire.
6
If necessary, install the work platforms in the crankcase.
6.1
Install the platform (94143) on the longitudinal beam of the column door and the
crank.
6.2
Install the adjustable platform (94142) at the applicable height on the steps in
the columns.
CLOSE UP
•
None
X82-B
AA00-0000-00AAA-012F-A
Maintenance Manual
Do maintenance work - general procedure
Winterthur Gas & Diesel Ltd.
- 81 -
Issue 001 2020-10
Summary of Contents for X82-B
Page 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Page 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Page 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Page 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Page 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Page 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Page 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Page 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Page 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...