![WinGD X82-B Maintenance Manual Download Page 370](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581370.webp)
PROCEDURE
1
Attach an applicable rope to hold the toggle lever up to prevent damage.
2
Attach the deviation pipe (006,
3
Operate the lever chain hoists (001, 003) to move the connecting rod (002) to the
position shown in view A.
4
Attach the shackle (005) to the cylinder block.
5
Attach the spur-geared schain block (004) to the shackle (005) and the lifting tool on the
connecting rod (002).
6
Operate the chain block (004) to hold the weight of the connecting rod (002).
7
Remove the lever chain hoists (001, 003).
8
Operate the turning gear and the chain block (004) to move the connecting rod (002)
counterclockwise to the position shown in view B.
9
Continue to operate the turning gear and the chain block (004) until the connecting rod
(002) goes through the column door (view C).
10
Attach the shackles (009) to the top platform.
11
Attach the applicable chain (008) to the two shackles (009).
12
Attach the chain block (007) to the chain (008) and the top end of the lifting tool.
13
Operate the chain block (007) to hold the weight of the connecting rod (002).
14
Remove the chain block (004).
X82-B
AA00-3303-00AAA-520A-A
Maintenance Manual
Connecting rod - remove
Winterthur Gas & Diesel Ltd.
- 370 -
Issue 001 2020-10
Summary of Contents for X82-B
Page 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Page 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Page 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Page 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Page 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Page 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Page 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Page 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Page 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...