![WinGD X82-B Maintenance Manual Download Page 365](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581365.webp)
PROCEDURE
1
2
Attach the two lever chain hoists (004) to the shackles (003).
3
Attach the two lever chain hoists (004) to the shackles (005) on the tool connecting rod
(009).
4
Apply Molyslip copaslip to the thread of the bolts (007).
5
Put the rods (006) into the connecting rod (002).
6
Operate the manual ratchets (004) to lift the tool (009) into position on the rods (006).
7
Tighten the nuts and bolts (008).
8
Torque the rods (006) to the correct value, refer to section
Fig 8-17
Connecting rod
9
Operate the turning gear and lever chain hoists to lower the crosshead to BDC.
10
) to the bearing cover.
11
Attach the eye bolt (001) to the guide shoe.
X82-B
AA00-3303-00AAA-523A-A
Maintenance Manual
Connecting rod - prepare before removal
Winterthur Gas & Diesel Ltd.
- 365 -
Issue 001 2020-10
Summary of Contents for X82-B
Page 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Page 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Page 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Page 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Page 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Page 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Page 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Page 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Page 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...