![WinGD X82-B Maintenance Manual Download Page 482](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581482.webp)
Fig 8-75
Piston - assemble (example)
001
002
003
004
005
006
007
008
009
010
011
012
013
10
Attach the hydraulic unit, the pressure gauge, the distributing piece and the flexible
hoses.
11
Install the round nuts to the elastic studs in the sequence given, refer to section
Tighten a round nut with a pre-tensioner
CLOSE UP
•
None
X82-B
AA00-3403-00AAA-710A-A
Maintenance Manual
Piston - assemble
Winterthur Gas & Diesel Ltd.
- 482 -
Issue 001 2020-10
Summary of Contents for X82-B
Page 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Page 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Page 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Page 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Page 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Page 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Page 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Page 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Page 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...