![WinGD X82-B Maintenance Manual Download Page 476](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581476.webp)
8.7.5
Piston (removed) - do checks of the surface and clearances
Periodicity
Description
Working hours
36 000
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
0.5 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Basic
AR
Support equipment
Description
Part No.
CSN
QTY
Template
94366
1
Feeler gauge
94122
1
Calliper gauge
N/A
1
Inside micrometer set
94101
1
Supplies
Description
QTY
Emery cloth
A/R
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
The piston must be removed, refer to section
•
The piston rings must be removed, refer to section
X82-B
AA00-3403-00AAA-360B-A
Maintenance Manual
Piston (removed) - do checks of the surface and clearances
Winterthur Gas & Diesel Ltd.
- 476 -
Issue 001 2020-10
Summary of Contents for X82-B
Page 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Page 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Page 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Page 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Page 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Page 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Page 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Page 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Page 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...