7.22 Gas Delivery System
Chapter 7: Accessories
TranStar® PC-100/PC-200/PC-300/PC-350/PC-400/PC-450/
Page 7 - 41
PC-500/PC-550/TR-500/SG-500/OB-450/OB-550/EL-550
Series Stretcher Service Manual (man115re)
7
7.22 Gas Delivery System
The Gas Delivery System attaches to the surgical rail located on either side of
the stretcher, providing gas supply to the patient, and also as a drape support
during the procedure.
Installation
Parts required:
Clean cloth
Approved hospital disinfectant
1. Loosen the mounting knob (D) on the gas delivery system (see figure 7-21
on page 7-41).
Figure 7-21. Gas Delivery System Installation
2. Slide the gas delivery system on the surgical rail (E).
NOTE:
The gas delivery system can be installed from the head end of the surgical rail
if the PACU extender is in the extended mode, or from the foot end of the
surgical rail if it is not.
m115c162