General Operation
Chapter 1: Introduction
Page 1 - 40
TranStar® PC-100/PC-200/PC-300/PC-350/PC-400/PC-450/
PC-500/PC-550/TR-500/SG-500/OB-450/OB-550/EL-550
Series Stretcher Service Manual (man115re)
Replacing
• Grasp the mattress stop located at the end of the foot section.
• Pull the foot section toward the foot end of the stretcher until the foot
section stops.
• Push the mattress stop downward rotating the rear of the foot section
upward until it locks into position.
• Ensure that the foot section is secure by giving it a tug inward, outward,
upward, and downward.
OB/GYN Stretcher Integrated Fiber Optic Exam Light
Operating
• Plug the unit into an appropriate power source.
• Turn the unit on. The on/off switch for the integrated fiber optic exam light
is located on the power box under the head section of the stretcher.
• Position the light head. Rotate the light head to change the focus on the
light.
• Drape the light for sterility.
WARNING:
Do not touch the illuminator box lamp immediately after use. Allow a
minimum of 30 minutes to cool before replacing the lamp. Failure to do
so could result in personal injury and equipment damage.
Storing
• Turn the power switch off.
• Position the light head so it is stored into the receptacle cavity on the right-
hand side of the catch basin.
CAUTION:
Remove the integrated fiber optic exam light assembly before spray
washing the stretcher. Failure to do so could result in equipment
damage.