4.10 Electric Stretcher Left/Right Siderail Cable Assembly and Upright Tube
Chapter 4: Removal, Replacement, and Adjustment Procedures
Page 4 - 32
TranStar® PC-100/PC-200/PC-300/PC-350/PC-400/PC-450/
PC-500/PC-550/TR-500/SG-500/OB-450/OB-550/EL-550
Series Stretcher Service Manual (man115re)
4. Using the torque wrench with the T30 Torx® head bit, torque the lower
pivot bolt (J)
to 140 + 10 in-lb (15.8 + 1.1 N·m).
5. Align the upper roller guide (C) and the plastic upper pivot (B) with the
hole in the upper pivot.
6. Install the two
new
ratchet rivets (A) to secure the upright tube (D) to the
upper pivot on the top rail.
7. Connect the wire connector at the patient control switch (R).
8. Install the screw (M) and washer (P) with the cable clamp (Q) that secures
the electric wire. Make sure the individual wires will not be seen once the
cover housing (O) is installed.
9. Using a T30 Torx® head bit and ratchet, install the two screws (N) that
secure the cover housing (O) to the patient control switch (R).
10. Pull the siderail cable assembly (K) and connector through the strain relief
nut (Q) (see figure 4-5 on page 4-14).
11. Connect the left siderail wiring assembly connector (A) to P2 on the
control board (H) (see figure 4-19 on page 4-39) or (see figure 4-20 on
page 4-39).
12. Connect the right siderail wiring assembly connector (F) to P3 on the
control board (H).
13. Using the ½" open end wrench, tighten the strain relief nut (Q) at the
electric box that secures the siderail cable assembly (see figure 4-5 on
page 4-14).
14. Using the ratchet and the T25 Torx® head bit, install the two screws (S)
and lockwashers (R) that secure the electrical box cover.
15. Using the ratchet and the T25 Torx® head bit, install the two screws (P)
and cable clamps (N) along the upper frame assembly.
16. Install the wire ties (M) that secure the cable assembly (K) and the CPR
cable (L) along the upper frame assembly.
17. Install the snap wire cover (J) (see figure 4-4 on page 4-13).
18. Cycle the siderail from the stored to the up position several times. Plug the
stretcher into an appropriate source, and test for proper operation.