Installation
Setup
2-14
Model 5030
i
SHARP Instruction Manual
Thermo Fisher Scientific
Figure 2–6.
Heater Assembly
4.
Attach a second tubing connector to the top of the heater tube.
5.
Carefully push additional 5/8-inch OD stainless steel tubing through
the roof flange and then drop into the tubing union on top of the
heater.
6.
Any exposed 5/8-inch OD stainless steel tubing should be insulated
with additional pipe insulation inside the shelter.
7.
Sleeve any additional water tight capping over the tubing that now
extends above the roof line.
8.
Sleeve the white Delrin plastic tripod adapter over the 5/8-inch OD
tubing to an appropriate height to accommodate the tripod and
To Rear Panel
5030
i
“H1”
Tubing Connector
Fasten Nut
Fasten Captive
Hardware (2)
Fasten Screws (2)
SHARP
Summary of Contents for 5030i SHARP
Page 4: ......
Page 22: ...Contents xviii Model 5030i SHARP Instruction Manual Thermo Fisher Scientific ...
Page 26: ...Figures xxii Model 5030i SHARP Instruction Manual Thermo Fisher Scientific ...
Page 168: ......
Page 218: ......
Page 294: ......
Page 306: ......
Page 402: ......
Page 403: ......