Installation
Setup
Thermo Fisher Scientific
Model 5030
i
SHARP Instruction Manual
2-11
Figure 2–4.
Model 5030
i
Top View—inches [millimeters]
Once the x-y coordinates of the instrument and roof flange system are
established and a waterproof flange system has been installed, perform a dry
run by attaching the heated sample tube on top of the 5030
i
base. If the
heated tube protrudes through the roof flange, either the instrument should
be lowered or an elongated PVC sleeve and cap system should cover the
heater while maintaining a waterproof seal. However, for the remainder of
this description, it is assumed the heater will fit within the ceiling height of
the air monitoring station.
Based on the vertical height requirements, use additional 5/8-inch OD
stainless tubing and connectors to make up the difference between the
desired inlet height and the top of the heater.
Additional routing is necessary for the ambient T/RH sensor assembly.
Heater
Summary of Contents for 5030i SHARP
Page 4: ......
Page 22: ...Contents xviii Model 5030i SHARP Instruction Manual Thermo Fisher Scientific ...
Page 26: ...Figures xxii Model 5030i SHARP Instruction Manual Thermo Fisher Scientific ...
Page 168: ......
Page 218: ......
Page 294: ......
Page 306: ......
Page 402: ......
Page 403: ......