Installation
Acceptance Testing and Startup Procedures
2-4
Model 5030
i
SHARP Instruction Manual
Thermo Fisher Scientific
program. Furthermore, it is an opportunity to assure that the monitor is
operating according to the manufacturer specifications.
After acceptance testing, a completed monitoring installation will require
final volumetric flow rate verification.
Prior to installing the Model 5030
i
, you should perform the acceptance
testing procedures. These tests are conducted to evaluate the out-of-box
performance of the instrument, perform any necessary calibrations prior to
final site installation, and familiarize the user with the menu structure.
Use the following procedure to perform the bench acceptance test.
Equipment Required:
Model 5030
i
Power Cord
Ambient Temperature/RH Cable Assembly
Vacuum Pump Assembly
Flow Adapter Assembly
NIST-traceable Thermometer
NIST-traceable Hygrometer
NIST-traceable Barometer
NIST-traceable Manometer(s)
NIST-traceable Volumetric Flow Transfer Standard
(
Do not
use the heated sample tube assembly at this point.
)
1.
After unpacking the instrument place the Model 5030
i
and accessories
onto a table or bench located within a stable indoor environment.
Remove the side-panel cover and inspect the filter tape. Leave cover
OFF until after acceptance testing has been completed.
Note
Prior to continuing with acceptance testing, the instrumentation and
accessories should have sufficient time to equilibrate to room temperature
due to temperature variations during shipping and/or storage.
▲
2.
Following a sufficient equilibration period, connect the power cord to
the rear of the instrument and to a properly grounded power supply.
Acceptance Test
Summary of Contents for 5030i SHARP
Page 4: ......
Page 22: ...Contents xviii Model 5030i SHARP Instruction Manual Thermo Fisher Scientific ...
Page 26: ...Figures xxii Model 5030i SHARP Instruction Manual Thermo Fisher Scientific ...
Page 168: ......
Page 218: ......
Page 294: ......
Page 306: ......
Page 402: ......
Page 403: ......