Installation
Acceptance Testing and Startup Procedures
Thermo Fisher Scientific
Model 5030
i
SHARP Instruction Manual
2-5
Note
If the Model 5030
i
turns ON at this point, set the power switch to
the OFF position and then proceed.
▲
3.
Connect the pump intake to the vacuum port mounted on the rear
panel of the instrument using the 3/8-inch vacuum tubing assembly
with the plastic T-fitting. Connect the pump exhaust tube to Port #2
on the 3-way solenoid on the rear panel.
4.
Connect Port #1 of the rear panel 3-way solenoid to 3/8-inch
compression fitting on the 5/8-inch x 3/8-inch reducing T-fitting using
the 3/8-inch vacuum tubing assembly with HEPA filter.
5.
Connect the vacuum pump power cord to the white circular grounded
power supply, labeled PUMP, on the rear panel of the instrument.
6.
Connect the 4-pin Temperature/RH cable to the 4-pin connector
labeled RH/TEMP on the rear of the monitor.
7.
Be sure that the pressure sensor calibration port toggle switches on the
rear panel are pushed outward and away from the /- Delta P.
8.
Set monitor power switch to the ON position.
During startup, the
i
Series splash screen will be shown followed by a
mechanical filter tape change and a cycling of the pump power.
To continue with the acceptance testing:
●
From the Main Menu select Diagnostics >
RH/Temperature
.
RH/TEMPERATURES:
AMBIENT RH 40.0 %
SAMPLE RH 36.4 %
AMBIENT TEMP 22.9
o
C
FLOW TEMP 23.9
o
C
BOARD TEMP 24.9
o
C
RANGE AVG DIAGS ALARM
The RH/Temperatures screen (read only) displays the current relative
humidity in percent and the temperature readings in °C. The board
temperature is the air temperature measured by a sensor located on the
measurement interface board.
Summary of Contents for 5030i SHARP
Page 4: ......
Page 22: ...Contents xviii Model 5030i SHARP Instruction Manual Thermo Fisher Scientific ...
Page 26: ...Figures xxii Model 5030i SHARP Instruction Manual Thermo Fisher Scientific ...
Page 168: ......
Page 218: ......
Page 294: ......
Page 306: ......
Page 402: ......
Page 403: ......