C
OMMISSIONING
P
ROCEDURE
82
16.Once the target charge pressure has been reached, WAIT at least five additional minutes for
pressure to stabilize. Make any fine adjustments to pressure during this time and then
disconnect the Staubli valve from the engine.
17. Close the helium source tank valve and bleed helium from the Helium Fill Kit prior to
removing the helium kit from source tank.
Table 12-1 Target Charging Pressure
PG600, PG1200,
PG1800 (LT
systems included)
PG5650 (LT systems included)
ENGINE TEMPERATURE
ENGINE CHARGE PRESSURE
[°F]
[°C]
[pisg]
[bar-g]
-4
-20
650
44.7
5
-15
665
45.7
14
-10
675
46.6
23
-5
690
47.5
32
0
700
48.4
41
5
715
49.3
50
10
730
50.2
59
15
740
51.1
68
20
755
52
77
25
765
52.9
86
30
780
53.8
95
35
795
54.7
104
40
805
55.6
113
45
820
56.5
122
50
830
57.4
131
55
845
58.3
140
60
860
59.3
Summary of Contents for PowerGen 5650 Series
Page 1: ...7045 102089 000 June 1 2021 Installation Operation Manual FOR A QUALIFIED INSTALLER...
Page 8: ...iv...
Page 12: ...iv Figure 21 9 ATS Enclosure 179 Figure 21 10 Battery Connection Schematic 181...
Page 28: ...SYSTEM INTRODUCTION 16 Figure 3 6 P ID Diagram...
Page 69: ...QNERGY LYNX SOFTWARE 57 Figure 6 57 FPC FEB QEC Firmware Update...
Page 158: ...MAINTENANCE 146 Figure 17 2 Radiator and Over Flow Tank...
Page 194: ...POWERGEN OPTIONAL FEATURE SETS 182...