12.12 COOLANT TOP-OFF INSTRUCTIONS
The PowerGen’s coolant loop is shipped full to the customer location.
During commissioning the coolant loop may need to be topped-off. Approximately 4.2 gallons
of 50/50, Antifreeze coolant mixture will be required to fill entire coolant loop.
The PowerGen requires Preston AF2000 Cor-Guard antifreeze coolant, 50/50, coolant/water
mix (4.2 gal total). This is the same coolant mixture used in the automotive industry in
heavy-duty automobiles.
If for any reason the coolant loop is empty and needs to be filled, please follow the Coolant Fill
procedure located in “Coolant Fill Instructions” on page 144.
12.13 HANDOVER TO USER
After installation of the PowerGen is complete, the installer shall:
1. Instruct the user in the operation of the PowerGen and any external safety devices required
by local regulations
2. Give the Operation Manual to the user.
3. Clean up the area, if necessary.
4. Ask customer to sign the Commissioning checklist prior to leaving site.
13. STARTUP PROCEDURE
1. Open the gas shut-off valve.
WARNING:
FOR YOUR OWN SAFETY READ BEFORE
OPERATING
WARNING:
Before operating, visually inspect all
the interfacing wiring and plumbing and make
sure that they are not damaged. If there is a smell
of gas in the room, follow the safety instructions in
Summary of Contents for PowerGen 5650 Series
Page 1: ...7045 102089 000 June 1 2021 Installation Operation Manual FOR A QUALIFIED INSTALLER...
Page 8: ...iv...
Page 12: ...iv Figure 21 9 ATS Enclosure 179 Figure 21 10 Battery Connection Schematic 181...
Page 28: ...SYSTEM INTRODUCTION 16 Figure 3 6 P ID Diagram...
Page 69: ...QNERGY LYNX SOFTWARE 57 Figure 6 57 FPC FEB QEC Firmware Update...
Page 158: ...MAINTENANCE 146 Figure 17 2 Radiator and Over Flow Tank...
Page 194: ...POWERGEN OPTIONAL FEATURE SETS 182...