*PowerGen is shipped full of coolant from the factory. However topping-off the coolant level
may be required during commissioning.
11.3 ELECTRICAL CONNECTION
11.3.1 POWERGEN INTERFACES
Stand-alone PowerGen installation requires minimum effort to connect it into customer site
infrastructure. There are only four points of interaction:
• Power Interface
• Communication and Control Interface (F.E.B.)
• User (LUI) Interface (see PowerGen Operators manual for further details)
• Fuel Interface
11.3.2 power and Communication Feeds
Gas Leak Detector Spray or
Sensor
1 (bottle)
Gas Connection
Table 11-1 Tools and Materials
Description
Quantity
Purpose
WARNING:
There is a danger of fatal electric shock
from touching live connections. Make sure the
PowerGen is switched off before you perform
electrical connection. An improper electrical
connection can make the PowerGen unsafe to
operate and result in personal injury and/or
material damage. The electrical installation,
including grounding, must be performed by a
suitably qualified electrician, who is responsible for
making sure that it complies with local regulations.
Cables must not touch any unit component that
could become hot during operation of the
PowerGen.
Summary of Contents for PowerGen 5650 Series
Page 1: ...7045 102089 000 June 1 2021 Installation Operation Manual FOR A QUALIFIED INSTALLER...
Page 8: ...iv...
Page 12: ...iv Figure 21 9 ATS Enclosure 179 Figure 21 10 Battery Connection Schematic 181...
Page 28: ...SYSTEM INTRODUCTION 16 Figure 3 6 P ID Diagram...
Page 69: ...QNERGY LYNX SOFTWARE 57 Figure 6 57 FPC FEB QEC Firmware Update...
Page 158: ...MAINTENANCE 146 Figure 17 2 Radiator and Over Flow Tank...
Page 194: ...POWERGEN OPTIONAL FEATURE SETS 182...