P
OWER
G
EN
R
EPORTS
AND
C
HECKLISTS
158
9
• Verify Customer electrical load matches Site Survey before
connecting customer electrical load to PowerGen
• Customer load to be connected only after initial running of the
PowerGen
• Check wiring, check grounding
10
Reconnect customer electrical load to Qnergy terminal blocks after
verifying customer loads (See “Electrical Connection” on page 64):
• Measure voltage and current output from PowerGen
• Verify load does not exceed generated power
11
Side panels installed and front access door closed (See “Panel Removal”
12
Verify no active warnings
13
Mention and non-standard activity to engineering change done on the
PowerGen that was not mentioned above or not according to the formal
Installation Manual from Qnergy:
Customer Signature
Date (DD/MM/YYYY)
Commissioning Agent Signature
Date (DD/MM/YYYY)
Table 19-4 Commissioning Checklist
Step #
Step
Initials
Summary of Contents for PowerGen 5650 Series
Page 1: ...7045 102089 000 June 1 2021 Installation Operation Manual FOR A QUALIFIED INSTALLER...
Page 8: ...iv...
Page 12: ...iv Figure 21 9 ATS Enclosure 179 Figure 21 10 Battery Connection Schematic 181...
Page 28: ...SYSTEM INTRODUCTION 16 Figure 3 6 P ID Diagram...
Page 69: ...QNERGY LYNX SOFTWARE 57 Figure 6 57 FPC FEB QEC Firmware Update...
Page 158: ...MAINTENANCE 146 Figure 17 2 Radiator and Over Flow Tank...
Page 194: ...POWERGEN OPTIONAL FEATURE SETS 182...