P
OWER
G
EN
R
EPORTS
AND
C
HECKLISTS
155
19. POWERGEN REPORTS AND CHECKLISTS
19.1 INSTALLATION SEQUENCE
Table 19-1 Installation Checklist
Sequence
Number
Work Description
1
Place PowerGen and Level (Section 9.1 Floor)
2
Electrical Connections (Section 11.3 Electrical Connection)
3
Communication and Control Connections (Section 11.3 Electrical Connection)
4
Gas Connection
(Chapter 11.4, Installation Manual)
Customer Gas Pressure to PowerGen
• 3-50 PSI, Natural Gas
• 2-10 PSI, LPG
• Biogas (consult with Qnergy Engineering Dept.)
5
Earth Ground Connection to front of PowerGen enclosure (Section 11.3.7
PowerGen earth ground connection)
Customer Signature
Date (DD/MM/YYYY)
Table 19-2 Safety Checks and Basic Information
#
Safety Checks and Basic Information
Initials
1
PowerGen received with no visual damage on shipping crate or on the
appliance.
2
There are no spillages inside the PowerGen, below or around it.
3
There is access to PowerGen for servicing.
4
There are no combustibles around or below the PowerGen.
5
The location where PowerGen located approved by a local safety person and
according to local regulation.
6
Gas connected to PowerGen according to the installation manual and local
regulations.
Summary of Contents for PowerGen 5650 Series
Page 1: ...7045 102089 000 June 1 2021 Installation Operation Manual FOR A QUALIFIED INSTALLER...
Page 8: ...iv...
Page 12: ...iv Figure 21 9 ATS Enclosure 179 Figure 21 10 Battery Connection Schematic 181...
Page 28: ...SYSTEM INTRODUCTION 16 Figure 3 6 P ID Diagram...
Page 69: ...QNERGY LYNX SOFTWARE 57 Figure 6 57 FPC FEB QEC Firmware Update...
Page 158: ...MAINTENANCE 146 Figure 17 2 Radiator and Over Flow Tank...
Page 194: ...POWERGEN OPTIONAL FEATURE SETS 182...