8.2.5
Site Survey
8-28
DECT Portable Station Section
8.2.5
Site Survey
After the Site Survey
After obtaining the proper measurement results, the following pro-
cedures are required before mounting the Cell Station to the wall.
1. Disconnect the AC Adaptor.
2. Switch the Radio Signal Test Switch of the Cell Station from
ON to OFF.
3. Connect the cable from the Cell Station Interface Unit to the
Cell Station, and pass the cord through the groove on the unit.
01 01 01
01
01
01
1
0
1
0
1
0
1
0
1
0
1
0
ON
1
2
3
4
5
6
OFF
Radio Signal Test Switch
Summary of Contents for KX-TD1232E
Page 95: ...2 51 8 Blank ...
Page 102: ......
Page 309: ...4 11 2 Blank ...
Page 324: ...4 24 2 Blank ...
Page 352: ...4 42 2 Blank ...
Page 393: ...4 69 14 Blank ...
Page 411: ...4 83 4 Blank ...
Page 492: ...4 142 8 Blank ...
Page 494: ...4 144 Blank ...
Page 532: ......
Page 533: ...Section 5 List This section lists tone ring tone and default values of system programming ...
Page 631: ......