Installation
2-7
2.2
Installation of the Main Unit
2.2.4
Frame Earth Connection
IMPORTANT!!!
You must connect the frame of the main unit to Earth.
2.2.5
Opening Front Cover
Two screws are attached to the front cover by springs so that they
will not be lost. To open the front cover of the main unit:
1. Loosen the two screws on the right side of the main unit.
2. Open the front cover in the direction of Arrow .
To ground
D1232
D1232
DIGITAL SUPER HY
BRID SYSTEM
D1232
D1232
DIGITAL SUPER HY
BRID SYSTEM
Panasonic
Panasonic
A
Screw
Screw
To Earth
A
To Earth
Panasonic
Panasonic
D816
D816
DIGITAL SUPER HY
BRID SYSTEM
To Earth
Panasonic
Panasonic
D816
D816
DIGITAL SUPER HY
BRID SYSTEM
A
Screw
Screw
Summary of Contents for KX-TD1232E
Page 95: ...2 51 8 Blank ...
Page 102: ......
Page 309: ...4 11 2 Blank ...
Page 324: ...4 24 2 Blank ...
Page 352: ...4 42 2 Blank ...
Page 393: ...4 69 14 Blank ...
Page 411: ...4 83 4 Blank ...
Page 492: ...4 142 8 Blank ...
Page 494: ...4 144 Blank ...
Page 532: ......
Page 533: ...Section 5 List This section lists tone ring tone and default values of system programming ...
Page 631: ......