Trouble locating and clearing procedures -5
DMS-100 Family Trouble Locating and Clearing Procedures Volume 2 of 2 LET0015 and up
Testing the operation of ANI and COIN voltages
(continued)
PWR CRD SHORT: -7 -7 EXPECTED : -12 to 0
RING GEN : -48 -48 EXPECTED : -55 to -38
PWR CRD OPEN : 14 14 EXPECTED : 38 to 55
COIN COLLECT : **** **** EXPECTED : 115 to 140
COIN RETURN : **** **** EXPECTED : -140 to -115
Last LCM COVREX test was MON. 2001/10/29 at 16:25:16
FAILED.
4
Determine if the test passed.
If the test
Do
passed
failed