1-238 Trouble locating and clearing procedures (continued)
297-8021-544 Standard 14.02 May 2001
Replacing an NTFX39 bulkhead splitter unit
(continued)
Summary of Replacing an NTFX39 bulkhead splitter unit
This flowchart summarizes the
procedure.
Use the instructions in the
procedure that follows this
flowchart to perform the
procedure.
Post the IOC
Manually busy
all devices
Manually busy
IOM
Change
bulkhead
splitter unit
Return the IOC
to service
Return all ports
to service
End