1-354 Trouble locating and clearing procedures (continued)
297-8021-544 Standard 14.02 May 2001
Running a C7BERT for high-speed links
(continued)
If the equipment type is DMS, personnel at the far-end can determine the
signaling terminal status as follows:
•
Type
PM and press the Enter key to access the PM level of the MAP
display.
•
Type
POST HLIU dliu_no and press the Enter key to post the HLIU.
•
Type
LOOPBK S and press the Enter key to display the terminal status.
Users of equipment that is not DMS should contact their next level of support
to obtain the procedures for their equipment.
34
To activate the far-end DS-1 ESF loopback from your end, type
>CARLOOP START link_no loopback_type
and press the Enter key.
where
link_no
is the number of the link you want to test (0 to 15)
loopback_type
indicates if the loopback is line (R) or payload (P)
Example input:
>CARLOOP START 1 R
35
Your next step depends on the response.
36
To stop the existing HSL C7BERT, type
>STOP link_no
and press the Enter key.
where
link_no
is the number of the link you entered in step 34
If the response is
Do
Link nn: DS-1 EFT Loop ON
complete
Carrier line loopback at far-end
paddleboard
step 39
Link nn: Failed - C7BERT al-
ready active on this link
step 36
Link 1: Failed - Far-end DS-1
ESF already active on this link
step 37
Link nn: Failed - Has not gone
into loopback.
step 78
anything else
step 78