214685
62
Revision A
Figure 5.2: Switch Harness Routing
1.
Before attaching any cable ties, route switch
harness (A) from the front of the feeder house to the
power connection point in the cab. Ensure the harness
is long enough to reach the wiring at the selector valve
with the header tilted forward, and that the feeder house
can be fully lowered with adequate slack in the harness.
Figure 5.3: Left Side of Feeder House
2.
Use the cable ties provided to fasten the switch
harness (A) to the main harness on the left side of the
feeder house and under the cab floor at locations (B).
IMPORTANT:
To prevent damage to harness, fully lower feeder house
and ensure there is adequate slack before attaching
cable ties (B) to the harness.
Figure 5.4: Harness under Right Side of
Cab Floor
3.
Route the switch harness (A) at the rear of the feeder
house up to the underside of the cab floor at
location (B).
4.
Use the cable ties provided to fasten the switch
harness (A) to the main harness under cab floor at
location (B).
Summary of Contents for FlexDraper FD1 Series
Page 2: ...FD1 Series FlexDraper Header Published June 2018...
Page 12: ......
Page 42: ......
Page 45: ...214685 33 Revision A Figure 4 6 Filler Cap 10 Install filler cap A SETTING UP FLOAT MODULE...
Page 72: ......
Page 116: ......
Page 166: ......
Page 336: ......
Page 350: ......
Page 353: ......