![MacDon FlexDraper FD1 Series Unloading And Assembly Instructions Download Page 197](http://html2.mh-extra.com/html/macdon/flexdraper-fd1-series/flexdraper-fd1-series_unloading-and-assembly-instructions_3353032197.webp)
214685
185
Revision A
Checking Voltage Range from the Combine Cab (Case IH 7010/8010, 7120/8120/9120,
7230/8230/9230, 7240/8240/9240)
NOTE:
Changes may have been made to the combine controls or display since this document was published. Refer to the
combine operator
’
s manual for updates.
CAUTION
Check to be sure all bystanders have cleared the area.
1.
Position the header 150 mm (6 in.) above the ground, and unlock the float.
Figure 7.66: Float Lock
2.
Check that float lock linkage is on down stops
(washer [A] cannot be moved) at both locations.
NOTE:
If the header is not on down stops during the next two
steps, the voltage may go out of range during operation
causing a malfunction of the auto header height control
(AHHC) system.
Figure 7.67: Float Indicator Box
3.
Adjust cable take-up bracket (B) (if necessary) until
pointer (A) on float indicator is on 0.
Summary of Contents for FlexDraper FD1 Series
Page 2: ...FD1 Series FlexDraper Header Published June 2018...
Page 12: ......
Page 42: ......
Page 45: ...214685 33 Revision A Figure 4 6 Filler Cap 10 Install filler cap A SETTING UP FLOAT MODULE...
Page 72: ......
Page 116: ......
Page 166: ......
Page 336: ......
Page 350: ......
Page 353: ......