Figure 7.25: Cable Routing around Pulleys
7.
With the longer end of the new float indicator cable on
the left, loop the middle section of the cable (the section
in between the innermost boot seals and jam nuts) (A)
around the three pulleys in the float indicator box as
shown at right.
Figure 7.26: Float Indicator Cable Secured to
Left Side of the Float Indicator Bottom Support
–
Right Side is Opposite
8.
Secure the left side of the new float indicator cable (A)
to the left side of the float indicator bottom support as
follows:
a.
On float indicator cable (A), jam nuts and boot
seals are positioned in four locations. Select the
second location from the left.
b.
Remove boot seal (B), and slide cable (A) through
the slot on the left side of the float indicator bottom
support (C).
c.
Insert the threaded end of cable housing (D) into
the hole in support (C), and then thread boot
seal (B) onto the housing.
d.
Tighten jam nuts (E).
Figure 7.27: Cable Routing on Left Side of
Float Module
9.
Route the left end of the new float indicator cable (A)
through hose holder (B), behind gussets (C) at the top
of the inboard float spring, through hole (D) into the float
module hydraulic/electrical enclosure, and then back
through hole (E) in the bottom of the float module
hydraulic/electrical enclosure to the front side of the
float module.
Summary of Contents for FlexDraper FD1 Series
Page 2: ...FD1 Series FlexDraper Header Published June 2018...
Page 12: ......
Page 42: ......
Page 45: ...214685 33 Revision A Figure 4 6 Filler Cap 10 Install filler cap A SETTING UP FLOAT MODULE...
Page 72: ......
Page 116: ......
Page 166: ......
Page 336: ......
Page 350: ......
Page 353: ......