
Recovering the server firmware (UEFI update
failure) . . . . . . . . . . . . . . . . . .
In-band manual recovery method . . . . .
In-band automated boot recovery method . .
Out-of-band method . . . . . . . . . .
Automated boot recovery (ABR) . . . . . . . .
Nx-boot failure. . . . . . . . . . . . . . .
Chapter 4. Parts listing, Lenovo
NeXtScale nx360 M5 compute
node . . . . . . . . . . . . . . . . . .
Replaceable server components. . . . . . . .
Structural parts. . . . . . . . . . . . .
Chapter 5. Removing and replacing
components . . . . . . . . . . . . .
Installation tools . . . . . . . . . . . . . .
Installing an optional device . . . . . . . . .
Installation guidelines . . . . . . . . . . . .
System reliability guidelines . . . . . . . .
Handling static-sensitive devices
Returning a device or component . . . . .
Updating the compute node configuration . .
Removing a compute node from a chassis. . . .
Installing a compute node in a chassis . . . . .
Removing a storage tray from a compute node . .
Installing a storage tray into a compute node . . .
Removing a GPU tray from a compute node . . .
Installing a GPU tray into a compute node . . . .
Removing a 2U GPU tray from a compute node . .
Installing a 2U GPU tray into a compute node . .
Removing and replacing structural parts
Removing the compute node cover. . . . .
Installing the compute node cover . . . . .
Removing the PCI riser filler. . . . . . . .
Replacing the PCI riser filler. . . . . . . .
Removing the bezel . . . . . . . . . . .
Replacing the Bezel . . . . . . . . . . .
Removing the filler from the GPU tray . . . .
Replacing the filler on to the GPU tray. . . .
Removing the front handle . . . . . . . .
Installing the front handle. . . . . . . . .
Removing the rear hard disk drive cage . . .
Installing the rear hard disk drive cage
Removing and replacing Tier 1 CRUs . . . . . .
Removing a RAID adapter battery . . . . .
Replacing a RAID adapter battery . . . . .
Removing a RAID adapter battery holder
Replacing a RAID adapter battery holder
Removing the optional front 2.5-inch hot-swap
hard disk drive cage. . . . . . . . . . .
Installing the optional front 2.5-inch hot-swap
hard disk drive cage. . . . . . . . . . .
Removing the IMM interposer assembly . . .
Replacing the IMM interposer assembly . . .
Removing the power paddle card from the
GPU tray . . . . . . . . . . . . . . .
Replacing the power paddle card on to the
GPU tray . . . . . . . . . . . . . . .
Removing the system battery . . . . . . .
Replacing the system battery . . . . . . .
Removing a memory module . . . . . . .
Installing a memory module . . . . . . . .
Removing the hard disk drive backplate . . .
Installing the hard disk drive backplate . . .
Removing and installing drives
Removing a ML2 riser-cage assembly. . . .
Replacing a ML2 riser-cage assembly. . . .
Removing a PCI riser-cage assembly . . . .
Replacing a PCI riser-cage assembly . . . .
Removing a PCI riser-cage assembly from the
GPU tray . . . . . . . . . . . . . . .
Replacing a PCI riser-cage assembly to the
GPU tray . . . . . . . . . . . . . . .
Removing a PCI riser-cage assembly from the
2U GPU tray . . . . . . . . . . . . . .
Replacing a PCI riser-cage assembly to the
2U GPU tray . . . . . . . . . . . . . .
Removing an adapter/GPU adapter. . . . .
Replacing an adapter/GPU adapter. . . . .
Removing the SD adapter . . . . . . . .
Replacing the SD adapter . . . . . . . .
Removing a ServeRAID SAS/SATA
controller . . . . . . . . . . . . . . .
Replacing a ServeRAID SAS/SATA
controller . . . . . . . . . . . . . . .
Removing the USB flash drive . . . . . . .
Installing the USB flash drive . . . . . . .
Removing and replacing Tier 2 CRUs . . . . . .
Removing a microprocessor and heat sink . .
Replacing a microprocessor and heat sink . .
Removing the compute node . . . . . . .
Installing the compute node. . . . . . . .
Internal cable routing and connectors. . . . . .
Cabling hard disk drive with planar cable . .
Cabling hard disk drive with ServeRAID
SAS/SATA controller. . . . . . . . . . .
Cabling hard disk drive backplane with 2U
GPU tray . . . . . . . . . . . . . . .
Cabling front PCI riser assembly of 2U GPU
tray with SAS hard disk drive cable . . . . .
ii
Lenovo NeXtScale nx360 M5 Installation and Service Guide
Summary of Contents for NeXtScale nx360 M5
Page 1: ...Lenovo NeXtScale nx360 M5 Installation and Service Guide Machine Type 5465 ...
Page 42: ...28 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 98: ...84 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 114: ...100 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 242: ...228 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 818: ...804 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 1002: ...988 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 1009: ...Taiwan Class A compliance statement Appendix E Notices 995 ...
Page 1010: ...Taiwan BSMI RoHS declaration 996 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 1012: ...998 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 1020: ...1006 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 1021: ......
Page 1022: ...Part Number 00MV789 Printed in China 1P P N 00MV789 1P00MV789 ...