
Step 3.
Align the ML2 riser-cage assembly with the ML2 riser connector on the system board; then, grasp
the rear side of the ML2 riser-cage touch point and the front ML2 rise- cage suitable location of the
ML2 riser-cage assembly.
Step 4.
Press down firmly until the ML2 riser-cage assembly is seated correctly in the connector on the
system board.
000
000
000
000
000
000
000
00000000000
00000000000
00000000000
00000000000
00000000000
00000000000
00000000000
00000000000
00000000000
0
0
00
00
ML2 riser cage assembly
Figure 107. ML2 riser-cage assembly installation
Step 5.
Replace the cover (see “Installing the compute node cover” on page 115).
Step 6.
Slide the server into the rack.
Step 7.
Reconnect the power cords and any cables that you removed.
Step 8.
Turn on the peripheral devices and the server.
Removing a PCI riser-cage assembly
Before you remove a PCI riser-cage assembly, complete the following steps:
1. Read “Safety” on page v and “Installation guidelines” on page 101.
2. If the compute node is installed in a NeXtScale n1200 Enclosure, remove it (see “Removing a compute
node from a chassis” on page 104 for instructions).
3. Carefully lay the compute node on a flat, static-protective surface, orienting the compute node with
the bezel pointing toward you.
Note:
PCI riser-cage brackets must be installed even if you do not install an adapter.
To remove a PCI riser-cage assembly, complete the following steps:
Step 1.
Remove the cover (see “Removing the compute node cover” on page 113).
176
Lenovo NeXtScale nx360 M5 Installation and Service Guide
Summary of Contents for NeXtScale nx360 M5
Page 1: ...Lenovo NeXtScale nx360 M5 Installation and Service Guide Machine Type 5465 ...
Page 42: ...28 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 98: ...84 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 114: ...100 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 242: ...228 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 818: ...804 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 1002: ...988 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 1009: ...Taiwan Class A compliance statement Appendix E Notices 995 ...
Page 1010: ...Taiwan BSMI RoHS declaration 996 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 1012: ...998 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 1020: ...1006 Lenovo NeXtScale nx360 M5 Installation and Service Guide ...
Page 1021: ......
Page 1022: ...Part Number 00MV789 Printed in China 1P P N 00MV789 1P00MV789 ...